Governor Signs Bill to Fund Arkansas Valley Conduit — Southeastern Colorado Water Conservancy District

Here’s the release from the Southeastern Colorado Water Conservancy District (Chris Woodka):

The Southeastern Colorado Water Conservancy District applauded state approval of a $100 million financing package for the Arkansas Valley Conduit that will allow construction to begin in the near future.

The Colorado General Assembly passed the annual Colorado Water Conservation project bill which contains the funding earlier this month, and Governor Jared Polis signed the bill into law on Monday.

“The Arkansas Valley Conduit will be a lifeline for the Lower Arkansas Valley for generations to come,” said Bill Long, President of the Southeastern District. “Governor Polis, the General Assembly and the CWCB have all shown vision and foresight with this support of the AVC. This goes beyond just financing a pipeline, because really it’s an investment to assure clean drinking water for the future.”

Long also noted the strong bipartisan support the AVC enjoys from the entire Colorado congressional delegation, and noted in particular the leadership of Senators Cory Gardner and Michael Bennet, and Congressmen Scott Tipton and Ken Buck.

“I want to thank the CWCB board and staff for including this funding in their annual bill, and express our sincere gratitude to the legislators from the Arkansas Basin for their leadership and support,” said Kevin Karney, chairman of the District’s AVC committee. “The recognition by the State of Colorado of the benefit of partnering with the Bureau of Reclamation on this project is an enormous boost.”

The AVC is estimated to cost between $564 million and $610 million to complete over a 15-year period. The $100 million in state funding would include $90 million in loans and $10 million in grants over the life of the project. When complete, the AVC will provide clean drinking water to 50,000 people in 40 communities.

The AVC had received funding since 2010 to prepare for construction of the 130-mile pipeline which will deliver a safe drinking water supply to the Lower Arkansas Valley. In February of this year, the Bureau of Reclamation announced that $28 million of FY ’20 funding was being directed to the conduit, in an effort to move from planning and design into construction. An additional $8 million has been requested for FY ’21 and is under consideration by Congress.

“The unanimous approval of this funding package by the CWCB board last November was the absolute catalyst for an improved federal funding picture,” said Southeastern District Executive Director Jim Broderick. “Colorado, like other Western states, recognizes developing a strong partnership with Reclamation allows us to overcome water quality and water supply challenges in rural areas.”

Arkansas Valley Conduit “A Path Forward” November 22, 2019 via Southeastern.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.