Energy policy — nuclear: Powertech plans ‘aquifer enhancement’ at proposed Centennial Project operation

A picture named uraniuminsituleaching.jpg

From the Fort Collins Coloradoan (Bobby Magill):

Powertech’s plan for in situ leaching now includes a process called “aquifer enhancement.” The report says aquifer enhancement involves raising the water table beneath the mine site by injecting fresh water into the ground around the perimeter of each field of wells used for uranium extraction. The fresh water, which will likely come from the Colorado-Big Thompson Project once water rights are purchased, will keep the oxygen levels around the uranium ore at the correct level so the ore can be extracted. The aquifer enhancement process will create a “hydraulic fence” around each well field, but the report says, “No modeling has been completed by Powertech to assess the effect of the hydraulic fence on the surrounding water resources during operation.”

David Berry, director of the Colorado Mined Land Reclamation Office, said he is uncomfortable speculating on what Powertech’s aquifer enhancement process might mean. “Regardless, state standards apply,” he said.

More nuclear coverage here and here.

Leave a Reply