Rocky Mountain National Park seeks citizen scientist help at Lily Lake

Lily Lake via Rocky Mountain National Park

From Rocky Mountain National Park via The Loveland Reporter-Herald:

The public can help Rocky Mountain National Park with scientific research when walking around Lily Lake.

“The Lily Lake Phenology Walk allows visitors to Rocky Mountain National Park an opportunity to collect scientific data and learn more about plant and animal species found within the park,” park spokeswoman Kyle Patterson said in a press release.

Citizen scientists will help document seasonal biological events in the project.

“Over time, as observations are collected, the park will gain a better understanding of how plants and animals at Rocky Mountain National Park respond to environment changes,” Patterson stated.

Researchers will use the information to determine answers to questions such as: Has there been a shift in when willow shrubs begin to bud in the spring? Are aspen leaves changing color later or earlier than in the past?

The Lily Lake Phenology Walk webpage, which can be accessed by Lily Lake visitors through a smartphone or a tablet with an internet browser, gives descriptive images to help participants answer simple questions related to the timing of biological life cycle events of certain species found along the trail.

Patterson said doing the research may add only 20 minutes to a hike on the 0.8-mile trail that circles Lily Lake, and can be done by frequent or one-time visitors of all ages.

Phenology is the study of the timing of biological life cycle events and how climate and habitat influence them.

Patterson said it has been a topic of interest lately as people contemplate how species will react to a changing climate, adding the data gathered with the Lily Lake Phenology Walk can help determine if there are shifts in the phenology of the park’s species in this area.

Further information, including links to the questions page and previously submitted data, visit http://go.nps.gov/LilyLakeScience.

For more information about Rocky Mountain National Park, call 586-1206 or http://visit nps.gov/romo.

‘It’s Raining Plastic’: Researchers Find Microscopic Fibers in Colorado Rain Samples — EcoWatch

Sprague Lake via Rocky Mountain National Park.

From Circle of Blue (Brett Walton) via EcoWatch:

When Greg Wetherbee sat in front of the microscope recently, he was looking for fragments of metals or coal, particles that might indicate the source of airborne nitrogen pollution in Rocky Mountain National Park. What caught his eye, though, were the plastics.

The U.S. Geological Survey researcher had collected rain samples from eight sites along Colorado’s Front Range. The sites are part of a national network for monitoring changes in the chemical composition of rain. Six of the sites are in the urban Boulder-to-Denver corridor. The other two are located in the mountains at higher elevation.

The monitoring network was designed to track nitrogen trends, and Wetherbee, a chemist, wanted to trace the path of airborne nitrogen that is deposited in the national park. The presence of metals or organic materials like coal particles could point to rural or urban sources of nitrogen.

He filtered the samples and then, in an inspired moment, placed the filters under a microscope, to look more closely at what else had accumulated. It was much more than he initially thought.

“It was a serendipitous result,” Wetherbee told Circle of Blue. “An opportune observation and finding.”

In 90 percent of the samples Wetherbee found a rainbow wheel of plastics, mostly fibers and mostly colored blue. Those could have been shed like crumbs from synthetic clothing. But he also found other shapes, like beads and shards. The plastics were tiny, needing magnification of 20 to 40 times to be visible and they were not dense enough to be weighed. More fibers were found in urban sites, but plastics were also spotted in samples from a site at elevation 10,300 feet in Rocky Mountain National Park.

The findings are detailed in a report published online on May 14.

‘As the Poudre Flows — Forest to Plains’ theme of Poudre River Forum

Scott Hummer, general manager of North Poudre Irrigation Company, talks about how his agency worked with Fort Collins Natural Areas and Colorado Parks and Wildlife to include a fish passage when the irrigation company replaced a diversion structure on the Poudre River that was destroyed by the 2013 floods. Work was completed [in February 2016]. (Pamela Johnson / Loveland Reporter-Herald)
Scott Hummer, general manager of North Poudre Irrigation Company, talks about how his agency worked with Fort Collins Natural Areas and Colorado Parks and Wildlife to include a fish passage when the irrigation company replaced a diversion structure on the Poudre River that was destroyed by the 2013 floods. Work was completed [in February 2016]. (Pamela Johnson / Loveland Reporter-Herald)

Here’s the release from Colorado State University (Jim Beers):

The Cache la Poudre River, which flows from the mountains through Fort Collins, Timnath and Windsor to the plains east of Greeley, is at the heart of countless activities: from irrigating crops and lawns to providing drinking water for more than 365,000 people and hosting numerous recreational activities.

Those with connections to and concerns for the Poudre River will gather on Friday, Feb. 3 for the fourth annual Poudre River Forum. After its first three years at Larimer County Fairgrounds, the forum is moving down the river to Greeley as a reminder that the Poudre River is important to all who benefit from it — from its headwaters to its confluence with the South Platte. This year’s forum — the theme is “As the Poudre Flows — Forest to Plains” — will be held from 8:30 a.m.-4:30 p.m. at the Island Grove Events Center, 501 N. 14th Ave., Greeley. Pre-registration is required for all participants.

Understanding the river, each other

Sponsored by the Poudre Runs Through It Study/Action Work Group, the forum serves as a community-wide gathering of people from agricultural, municipal, business, recreational and environmental backgrounds to learn about and discuss issues related to the Poudre River.

“The Poudre River Forum brings together those who use the river for agricultural and urban diversions and those who work to improve its ecological health. In the past those groups have not necessarily seen eye to eye,” said MaryLou Smith, PRTI facilitator. “Increasingly our participants are open to the idea that it takes collective vision and action to make the Poudre the world’s best example of a healthy, working river.”

Once again, this year’s event will be facilitated by the Colorado Water Institute at Colorado State University. “The Forum is a great opportunity for the communities connected by the Poudre River to come together to better understand the entire watershed, and each other,” said Reagan Waskom, director of CWI.

Forests and water quality/quantity

Laurie Huckaby with the U.S. Forest Service, will present “The last 1,000 years in the Poudre according to the trees,” to kick off the topic of how important the upper watershed is to water quantity and quality.

“Water quality and forests are inextricably linked,” said Joe Duda of the Colorado State Forest Service, who will join Huckaby as one of the presenters. “Forest conditions and insects, disease and fire all can have profound impacts on water flow and quality. Only healthy, resilient forests can continuously supply clean water.”

Global lessons for local success

“Finding the Balance: Managing Water for People and Nature” is the message of keynote speaker Brian Richter. Richter has been a global leader in water science and conservation for more than 25 years, and currently serves as chief scientist for the Global Water Program of The Nature Conservancy in Washington D.C. Richter’s ideas about the importance of recognizing the balance of working river/healthy river are the basis for which PRTI was initially formed. He has consulted on more than 120 water projects worldwide, and has served as a water advisor to some of the world’s largest corporations, investment banks, the United Nations, and has testified before Congress on multiple occasions. Richter co-authored,with Sandra Postel, the 2003 book Rivers for Life: Managing Water for People and Nature and in 2014 wrote Chasing Water: A Guide for Moving from Scarcity to Sustainability.

Change affects all sectors

An afternoon panel session will probe the impacts of change — positive and negative — along the Poudre River and how they have been similarly and differently addressed by agriculture, urban, and environmental sectors. They will discuss what anticipated future changes might these three sectors see as opportunities or incentives for mutually beneficial collaboration that could result in a healthier, working river?

“It has been said that the only thing that is constant is change,” said John Bartholow, retired ecologist from U.S. Geological Survey, and panel coordinator/moderator. “The question is, can we learn to adapt to those changes sure to come on the Poudre in ways that benefit agriculture, municipalities, and the environment?”

The panel will include Eric Reckentine, deputy director, City of Greeley Water and Sewer; John Sanderson, director of science, Nature Conservancy of Colorado; and Dale Trowbridge, general manager, New Cache la Poudre Irrigating Company.

Videos, displays and music too

The day-long forum also includes “River Snapshots” highlighting more than 15 projects undertaken by a variety of groups on the Poudre last year; “My How the Poudre Has Changed,” featuring historical 1970’s footage of the Poudre; updates from both the cities of Greeley and Fort Collins on current water programs; and over two dozen river-focused displays from community organizations and agencies. The day concludes with a social hour including food, beer and other beverages, and river-themed door prizes.

Registration is $50 and includes lunch. Scholarships for students and reduced rates are available. The deadline to register is Friday, Jan. 27 at http://prti.colostate.edu/forum_2017.shtml.

For more information, contact event coordinator Gailmarie Kimmel at PoudreRiverForum@gmail.com or 970-692-1443.

Rocky Mountain NP glacier loss a threat to water supply — the Fort Collins Coloradoan

Tyndall Glacier Rocky Mountain National Park via the SummitPost.org.
Tyndall Glacier Rocky Mountain National Park via the SummitPost.org.

From the Fort Collins Coloradoan (Jacy Marmaduke):

Rocky Mountain National Park’s glaciers are shrinking away.

And that’s a big problem — not only for the park’s scenic splendor, but also for Colorado communities that rely on water from the Poudre, Colorado and Big Thompson rivers, which are fed by meltwater from dozens of glaciers and glacierlike features strewn about the park.

For decades, Mother Nature has protected them from unfavorable conditions, but as the park’s temperatures climb and the promise of heavy winter snowfall grows more uncertain, the park’s glaciers and glacierlike features have slowly and unsteadily started to shrink.

A single decade of prolonged drought and warm summers could spell the beginning of the end for RMNP’s glaciers, according to one park ecologist. It’s already happened in California, where about a decade of drought and warming temperatures have pushed Yosemite National Park’s glaciers to near extinction.

“It’s sad to say, but most mountain glaciers are predicted to be gone by the end of the century,” said Dan McGrath, a Colorado State University research scientist. “I find it hard to believe (Rocky Mountain’s glaciers) could survive given the predicted warming and likely changes in precipitation.”

RMNP glaciers have always yo-yoed in size, partially melting in summer heat and regaining mass from winter flakes. The park has 30 glaciers, according to USGS topographic maps, but some of them technically aren’t glaciers anymore. Between the 1990s and 2005, the glaciers started to shrink at an increasing rate — perhaps faster than “at any other time in the historic record,” according to a 2007 Portland State University study.

And the park’s glaciers don’t have a lot of wiggle room. Its glaciers are tiny compared to well-known glaciers in Alaska, Greenland and elsewhere. RMNP’s biggest glacier is about 31 acres, the size of six Old Town Squares, and the smallest is smaller than two football fields, according to the 2007 study.

Scientists have no idea how the park’s glaciers have changed in volume over time and have only a limited record of how they’ve changed in area. McGrath wants to fix that.

He’s conducting a two-year study to find out how the glaciers have changed in area and volume since 2005 using historic maps, climate records, photographs and present-day measurements to fill the gaps in scientific understanding of the glaciers.

McGrath and his team are focusing mostly on the well-known Andrews and Tyndall glaciers but will monitor about 10 other glaciers along the Front Range. They’ll use electromagnetic waves to measure snow accumulation and ice thickness of the glaciers. With cutting-edge laser technology, they’ll create unprecedented 3D models of the glaciers. And they’re setting up timelapse cameras near stakes planted in the glaciers to study the timing of their shrinkage.

McGrath has discovered that Andrews and Tyndall glaciers are roughly the same size they were in 2005. They grew in 2010 and 2011 because of heavy snowfall but shrunk after that.

To get a better understanding of the glaciers’ timelines, McGrath will pore over climate models to see what’s in store for temperature and precipitation in the park’s higher elevations. It’s clear that warming will continue, but climate models are less certain about how precipitation will change over time in the Rocky Mountains.

Preliminary results from an ongoing study by Glenn Patterson, a CSU geosciences Ph.D. candidate, and Steven Fassnacht, a CSU snow hydrology professor, suggest that snowfall has decreased more in the park’s higher elevations than its lower areas.

Warming temperatures will melt more of the glaciers in summer, but warming temperatures’ larger impact could come in autumn and spring. A bump of a few degrees when temperatures are near the freezing point can turn snow into rain.

“Of all the things I’m worried about for glacier health, it’s that threshold,” McGrath said. “It can be 30 degrees and you get snow, or it can be 34 degrees and you might be getting only rain. That is going to dramatically alter both the behavior of the glacier and the mass balance. That’s universal.”

The final piece: McGrath’s team will study how glacier melt influences rivers, measuring streamflow and collecting water samples to see how much water glaciers contribute to rivers.

Downstream impacts are worth studying because the Colorado, Big Thompson and Poudre rivers are fed largely by snowmelt and groundwater. The park’s year-round snowfields have particularly important downstream impacts, and the snowfields behave a lot like glaciers.

Even a small loss in the snow and ice that feed Northern Colorado rivers would be a huge blow to Fort Collins and other nearby communities that rely on their water. The gradual melting of perennial snowfields bolsters late summer and fall streamflow, said Paul McLaughlin, an ecologist at the park’s Continental Divide Research Learning Center, and our water storage system depends on those established patterns. Changing water volumes and temperatures can irreparably damage delicate river ecosystems.

The strange thing about these glaciers is they shouldn’t really be here.

The park gets too warm in summer and not enough snow falls on them naturally, McGrath said. But most of the glaciers live in cirques that protect them from the summer sun, and aggressive winds shuttle snow across the Continental Divide, dumping between 5 and 10 times more snow on the glaciers than they would get from the sky alone.

“There’s something of a climate disconnect,” McLaughlin said. “In these systems where the glaciers have already retreated to these shady areas, there’s kind of a time lag in which the glaciers may persist even though the temperatures are getting warmer. But at some point in the future, we would expect they’ll reach a tipping point where they would quickly disappear.”

[…]

McLaughlin said the best-case scenario for the glaciers would be a future with less greenhouse gas emissions.

“We have the opportunity as humans to manage the amount of carbon dioxide we’re producing and putting into the atmosphere,” he said. “That will have an effect on our climate moving forward, and perhaps on the lifespan of our glaciers.”

RMNP: Sprague Lake dam repair slated for 2017

Sprague Lake via Rocky Mountain National Park.
Sprague Lake via Rocky Mountain National Park.

From the Associated Press via the Fort Collins Coloradoan:

Crews will repair and upgrade an aging dam at a popular lake in Rocky Mountain National Park next year.

The National Park Service said Tuesday the work at Sprague Lake Dam will be done in the fall of 2017, and parts of the trail around the lake will be closed.

The half-mile trail is wheelchair-accessible and affords sweeping mountain views. The lake is popular with anglers and picnickers and is open year-round.

Repair work will include improvements to the spillway, raising the dam slightly in some areas and reinforcing the lake side of the dam to prevent erosion.

The park had 4.1 million visitors last year and is on pace to exceed that this year. The park does not track visitor numbers to Sprague Lake.

Why #ClimateChange May Spell Trouble For Rocky Mountain National Park Lakes — #Colorado Public Radio

Loch Vale photo via LandscapeImagery.com
Loch Vale photo via LandscapeImagery.com

From Colorado Public Radio (Grace Hood):

A U.S. Geological Survey ecologist who also works with Colorado State University, [Jill] Baron has spent much of her professional life collecting data and writing research papers on the Loch Vale Watershed, which includes two glaciers, lakes and streams inside Rocky Mountain National Park…

Back in 1982, Baron set up instruments at the Loch Vale Watershed to measure weather and stream flows. When she first started, she said climate change wasn’t front and center.
“It was acid rain. I think the sheer excitement of discovery got a lot of people into studying acid rain,” she said.

But instead of acid rain, she found nitrogen was falling out of the sky into the park. It was causing changes to the ecosystem.

Over the decades Baron has become a small-but-mighty character in the ecology world. An inch over 5 feet tall, she none the less has chosen a branch of science that’s physically demanding. It takes a lot of work to collect field samples every week. She’s even enlisted her two kids.

The long-term data she’s gathered at Loch Vale Watershed is highly valued because it’s been gathered over such a long period of time. Most recently, the Watershed contributed data to a 2015 scientific paper on global lakes and climate change. It found lakes are warming faster compared to air or ocean temperatures. The paper projected a 20 percent boost in lake algae around the globe in the next century.

“When you warm the water, it makes it easier for algae and bacteria to take up nutrients. So you get more nutrient cycling, you get more productivity,” said Baron.

RMNP, Roosevelt Forest scars slow to heal from fire, flood — Fort Collins Coloradoan

High Park Fire June 14, 2012
High Park Fire June 14, 2012

From the Fort Collins Coloradoan (Stephen Meyers):

Scorched by the High Park Fire and washed out by the historic 2013 flood, Poudre Canyon’s once popular Young Gulch Trail remains closed to Northern Colorado hikers, mountain bikers and equestrians.

The one-two fire-flood punch has left scars that haven’t yet healed and outdoor lovers with fewer places to play, which has frustrated some recreational groups.

The natural disasters scoured away the first half-mile of the Young Gulch Trail, one of the most popular trails in the Poudre Canyon.

It is one of about 20 Northern Colorado recreation areas still closed nearly three years after the flood wiped out trails, roads and fishing access in Roosevelt National Forest, Rocky Mountain National Park and Big Thompson Canyon.

The damage is so severe, some areas may never reopen.

“I think people understand that this was a pretty dramatic change to our landscape,” U.S. Forest Service spokeswoman Reghan Cloudman said. “This is a long rebuilding process.”

Long and expensive.

While a $329,000 project has begun to rebuild Young Gulch Trail, the best case scenario is for the trail to reopen in late 2017. A more realistic goal is 2018.

The U.S. Forest Service estimates it will take $6.3 million to rebuild the recreation areas damaged on Roosevelt National Forest’s Canyon Lakes Ranger District west of Fort Collins.

The deluge caused approximately $10 million of damage in Rocky Mountain National Park, which bounced back from the flood and 2013 government shutdown to post back-to-back record visitation totals in 2014 and 2015. The park is on pace this year to beat its 2015 visitation record of 4.1 million visitors. But the park may take a massive hit to visitation this fall when repairs begin on flood-ravaged U.S. Highway 34 in Big Thompson Canyon, the gateway to the popular park.

As the U.S. Forest Service’s budget continues to dwindle, Canyon Lakes Ranger District must rely even more on Northern Colorado volunteers who last year dedicated more than 50,000 hours to trail projects. Only the Red Rocks District in Arizona received more volunteer hours in 2015.

“With the fire and then the flood, it’s definitely been a challenging time for us,” Cloudman said. “We’re adapting to how we do things. Cost-saving where we can, looking at creative ways to expand what we can do and move forward in the recovery efforts.”

One example: Working with partners like Wildland Restoration Volunteers and Great Outdoors Colorado, which helped secure funding for the Young Gulch Trail rebuild project through Colorado Parks and Wildlife’s State Trails Program.

With help from several volunteer organizations like Poudre Wilderness Volunteers, USFS has restored 63 percent of the 370 miles of flood-damaged roads on the Arapaho and Roosevelt National Forests and Pawnee National Grasslands, and 33 percent of the 157 miles of damaged trails, as of last year.

Fifteen campgrounds, day-use and river access facilities have been rebuilt, while 12 others have been decommissioned across the Canyon Lakes and Boulder ranger districts.

More than $100,000 and 10,000 hours have gone into reopening a portion of the North Fork Trail in Glen Haven. About as much money and work has been dedicated to the still-closed Lion Gulch Trail, which could open as early as September or as late as the summer of 2017, Cloudman said.

In Big Thompson Canyon, several fishing access areas were washed away and won’t be restored, including the North Fork and Glen Haven picnic sites and Idylwilde rest stop. Fishing access has been restored to Sleepy Hollow Park.

Cloudman said Canyon Lakes Ranger District hopes to offer more fishing access on the Big Thompson, one of Colorado’s premier fly-fishing destinations. Colorado Parks and Wildlife estimates the Big Thompson sees 2,559 angler days per month, totaling an annual economic impact of $2.37 million.

But the forest service’s plans to add more fishing access won’t be finalized until the Colorado Department of Transportation’s rebuild of U.S. 34 from Loveland to Estes Park is complete in 2018 or 2019.

Construction of the highway poses an economical and ecological impact to the Big Thompson’s fishing industry.

The first part of CDOT’s massive rebuilding project on U.S. 34 begins after July 4, with rock blasting in the horseshoe area of the canyon, near milepost 78.4.

The brunt of the work begins in October, after tourist season. Road crews will blast away the mountainside near the defunct Idylwilde Dam, a once-popular area for anglers. It remains to be seen if CDOT will completely close the highway for five months or enact temporary closures, allowing access during peak hours.

“If our guides don’t have access to the river, then obviously it’s going to affect business,” Christiansen said. “I don’t know exactly what’s going to happen, but it’s not like we have anything in our control.”

The same impact is happening on already popular hiking trails such as Greyrock and Hewlett Gulch, which are near Young Gulch Trail.

Cloudman said both trails have seen an uptick in visitors since the Young Gulch closure. In 2012, the trails averaged 44 and 33 people a day, respectively, with 70-80 visiting on the weekends.

But during last week’s Memorial Day weekend, more than 100 cars parked at Greyrock and along the shoulder of Colorado Highway 14 each day while passengers hiked the 7,513-foot peak.

Prior to its closure, Young Gulch averaged 37 daily visitors, with 75 on the weekends. Thanks to its close proximity to Fort Collins, the multiuse trail was popular with hikers, mountain bikers and equestrians.

But the 4.9-mile trail that meanders up Young Gulch and Prairie Gulch — crossing a stream about 20 times — was scoured by the flood, cutting 2- to 3-foot-deep ruts in the gulch and rerouting the stream channel.

The trail requires an extensive rebuild, essentially a move out of the floodplain.

“A monumental task,” Cloudman said.

In 2014, the forest service debated whether to even rebuild the trail. The agency held public meetings to gather feedback and developed an environmental analysis of the sustainability of the trail.

“It came down to, if we can find a good place and a good way to build a new, sustainable trail, then we absolutely will do it,” Cloudman said.

The new trail design will reduce the number of stream crossings by almost one third, move more of the trail out of the flood zone and provide a more sustainable route, Cloudman said. It will remain open to all users.

Working in a steep, constrained canyon won’t be easy for trail crews, which include Wildlands Restoration Volunteers, Overland Mountain Bike Club, Poudre Wilderness Volunteers and the Larimer County Conservation Corps.

Until the new trail is completed, hikers must endure the trail closure, marked by the closed gates, barricades and cones that have become a common site in the forest since flood and fire changed the landscape.

RMNP plans to restore the Lulu City wetland

Grand Ditch
Grand Ditch

From the Sky-Hi Daily News (Leia Larsen):

According to National Park Service officials, the 47,600 cubic-yard debris flow changed the river channel, deposited a large debris fan, increased sedimentation in the Colorado River, degraded ecosystems and damaged the aesthetics of a wilderness area. Because the area now contains more sediment and debris that it would under natural conditions, had the man-made canal never existed and never breached its bank, the Park began exploring solutions for restoration.

On Feb. 12, Park representatives announced the availability of their “Record of Decision,” which selected the referred alternative from the Environmental Impact Statement guiding the restoration process. Plans are to remove large debris deposits from the alluvial fan in the Lulu City wetland, stabilizing slopes and banks and restoring the Lulu City wetland by removing debris piles. Some small-scale motorized equipment will be used in the stabilization and revegetation efforts, and large equipment will be used to remove debris deposits and reconfigure the Colorado River through the Lulu City wetland.

According to a Park statement, there will be “short-term, adverse impacts on natural soundscape, wilderness, water resources, weltands, visitor use and experience, and wildlife from restoration activities and the use of mechanized equipment.” The long-term benefits, however, will be the high-level restoration to the area. At this time, he Park does not have any information regarding when restoration activities will begin.

A copy of the Record of Decision is available online at http://www.parkplanning.nps.gov/romo or by calling 970-586-1206.

CSU Sponsors First Poudre River Forum Feb. 8

Cache la Poudre River
Cache la Poudre River

Here’s the release from Colorado State University (Jennifer Dimas):

The Cache la Poudre River is life-blood for Northern Colorado. In recognition of its importance to the area, the community is invited to the first Poudre River Forum, 10 a.m. – 4:30 p.m. on Saturday, Feb. 8 at The Ranch Events Complex in Loveland. The forum, “The Poudre: Working River/Healthy River,” will focus on all of the river’s stakeholders, representing perspectives from agricultural, municipal, business, recreational and environmental backgrounds. Topics to be discussed include:

• The water rights of agricultural and municipal diverters;
• Where the water in the Poudre comes from and what it does for us;
• Ecological factors such as flow, temperature, fish and sedimentation.

The forum will feature presentations and dialogue, including remarks by State Supreme Court Justice Greg Hobbs about how the Poudre itself was the site of early conflict and cooperation leading to the development of the doctrine of prior appropriation in the West, and how water law has evolved in recent years.

Following the event, a celebration of the river will be held until 6 p.m. with refreshments and jazz by the Poudre River Irregulars.

Pre-registration is required by Jan. 31. The cost is $25; students 18 and under are free and scholarships are available. To register, visit http://www.cwi.colostate.edu/thepoudrerunsthroughit

The event is sponsored by The Poudre Runs Through It Study/Action Work Group facilitated by CSU’s Colorado Water Institute.

More Cache la Poudre River watershed coverage here and here.

Ag practices in Weld County impact RMNP, the Colorado Livestock Association hopes to help

Nitrogen Deposition via Knight Science Journalism
Nitrogen Deposition via Knight Science Journalism

From The Greeley Tribune (Eric Brown):

The local agriculture industry is teaming up with scientists and other experts, looking to possibly take the “biggest step yet” in addressing what’s been a major concern at Rocky Mountain National Park for several years. While Greeley is about 60 miles away from the park, ammonia drifting westward from ag operations in Weld County and surrounding areas, among other sources, has impacted the park’s ecosystem, according to studies.

Biologist Jim Cheatham said the 2006 Rocky Mountain National Park Initiative report revealed that nitrogen levels in the park are about 15 times more than natural amounts — with the excess coming in the form of nitrogen oxide from sources like fossil fuels, and also ammonia from ag operations. Such levels, according to Cheatham, have altered the vegetation composition, aquatic communities and overall natural processes of the alpine tundra the park was created to protect under its designations as a National Park, an International Biosphere Reserve and a Class I Airshed.

Now, the Colorado Livestock Association is voluntarily working with climatologists and other scientists in hopes of controlling the problem.

The Greeley-based organization is spearheading an effort to develop a warning system that will tell ag producers — based on atmospheric conditions — when they should or shouldn’t scrape manure from pens at feedlots and dairies, fertilize crops or perform other tasks that release ammonia into the atmosphere. Only when weather conditions are right does that ammonia drift from farms, ranches and dairies along the Front Range and northeast Colorado plains to Rocky Mountain National Park.

“So if we can just get more exact data about how and when that ammonia is moving into Rocky Mountain National Park … and then develop a warning system … that could really go a long way in fixing the problem,” said Bill Hammerich, president of the Colorado Livestock Association. “We know we’re not the only contributor to the issue, but we certainly want to do our part to help fix it.”

Such a warning system has been in discussions for about two years, Hammerich said, and it finally got off the ground this month, thanks to a recent $100,000 boost from the Conservation Innovation Grant program.

Cheatham said he’s “very appreciative” of the efforts being made by the Colorado Livestock Association and others, saying the development of a warning system could be the “biggest step yet” in addressing the high nitrogen levels in the park.

There’s no exact numbers showing how much of an impact agriculture operations have on the high nitrogen levels, but he said the 2006 report showed that about 55 percent of the excess nitrogen was coming from sources in Colorado, while the other 45 percent drifted in from outside the state. Cheatham said ongoing studies are attempting to pinpoint precisely how much ag and other industries are affecting nitrogen levels.

“We know agriculture’s impact is significant.”

William Brock Faulkner — a professor at Texas A&M University’s Biological and Agricultural Engineering Department, who’s helping with the warning-system endeavor — said the Colorado Livestock Association and other parties involved (Cheatham, the Colorado Corn Growers Association in Greeley and Colorado State University Atmospheric Science Department professors Jeffrey Collett and Russ Schumacher, among many others) are hoping to have about 30 to 40 producers in the region participating in a “pilot” program by March or April of next year, after more data is collected. Faulkner said some of the effort will be determining whether a warning system would even be economically feasible — not requiring producers to delay practices like manure removal, needed as part as of animal-health measures, for too many days.

But local producers say they’re willing to do their part.

“Myself and others in agriculture certainly don’t want to have a negative impact on the environment,” said Steve Gabel of Eaton, former president of the Colorado Livestock Association, and also operator of Magnum Feedyards, which has the capacity to hold nearly 25,000 head of cattle.

Gabel explained that many producers already have practices in place that help reduce the release of ammonia into the atmosphere, but added that, if a warning system can be developed, he could hold off on performing ammonia-releasing tasks for as many as a few days at a time, or even up to a week, if needed.

Cheatham said the overall goal is to ultimately cut nitrogen levels in the park by half — 1.5 kilograms of reactive nitrogen per hectare per year. He noted that it’s a “realistic and achievable goal,” but those levels would still be about seven or eight times the natural amounts of nitrogen in the park.

“We understand that, with human activity, natural levels are not achievable anymore,” he said, describing Rocky Mountain National Park as ahead of the curve in addressing the nitrogen issue compared to other parks. “But we certainly need to do what we can to control the problem.”

More water pollution coverage here.

Grand Lake: Reclamation lays out alternatives to help restore the lake’s historical clarity

grandlake.jpg

From the Sky-Hi Daily News (Reid Tulley):

Some of the alternatives for improving the clarity of Grand Lake that are discussed in the report include: Stopping pumping at the Farr Pumping Plant in July, August, and September; modify pumping at the plant during these three months; bypass Grand Lake with a buried pipeline and pump flows directly to Adams Tunnel; or bypass both Grand Lake and Shadow Mountain Reservoir with a buried pipeline and pump flows directly to Adams Tunnel…

Two standards for the clarity of Grand Lake were adopted by the Colorado Water Quality Control Commission in 2008.

The first standard is a narrative clarity standard requiring “the highest level of clarity attainable, consistent with the exercise of established water rights and the protection of aquatic life,” according to the report.

The second standard is a numerical clarity standard of a 4 meter Secchi disk depth that will be assessed by comparing 85 percent of available recordings from the months of July, August, and September. That means at least 85 percent of the measurements taken during those three months must meet the 4 meter Secchi disk depth standard, while 15 percent can be below the minimum requirement.

More Colorado River Basin coverage here and here.

Rocky Mountain National Park: The Lily Lake Dam Project will start turning dirt September 4

lilylakermnp.jpg

From The Estes Park Trail (John Cordsen):

“…the only option available to the park is to repair the dam, ” said park superintendent Vaughn Baker during his May report to the Estes Park board of trustees.

The work was required after the U.S. Bureau of Reclamation rated the Lily Lake Dam, located in Rocky Mountain National Park, as a high-hazard dam. This study was released in 2010. Failure of the dam was not imminent, which gave park staff time to evaluate long-term solutions, which ultimately became one option because of the legal requirements to maintain the water rights.

The Lily Lake Dam is situated at the headwaters of Fish Creek, which flows into Lake Estes in Estes Park. Fish Creek is about 5 miles in length and the elevation difference between Lily Lake and Lake Estes is about 1,500 feet. If the dam were to fail, the ensuing floodwaters could result in the loss of life and property along Fish Creek…

Repair to the Lily Lake Dam will be done in a manner to retain the lake and its features in a manner similar to what currently exists. The repair work may last through the end of November. During the repair work, a roughly 500-foot area of the Lily Lake Trail across the dam will be closed…

The repairs will involve the removal of surface vegetation on the downstream face of the dam, stripping and salvage of topsoil, regrading the downstream face of the dam and the area around the toe of the dam, placement of filter fabric (geotextile), filter gravel and another layer of filter fabric and installation of articulated concrete blocks (ACB).

More infrastructure coverage here and here.

Rocky Mountain National Park: The Park Service intends to repair Lily Lake Dam

lilylakermnp.jpg

From the Fort Collins Coloradoan (Kevin Duggan):

Park superintendent Vaughan Baker said a contractual requirement that the park retain the water rights assigned to the lake and maintain the dam forced the decision to repair the aging structure rather than remove it. “It turns out we are legally obligated to keep it,” Baker said in an interview Tuesday.

The decision is tentative based on the outcome of final consultations with the U.S. Fish and Wildlife Service, Baker said. The lake is stocked with greenback cutthroat trout, which is a native but threatened species. Repairing the dam is expected to cost more than $800,000. Construction is expected to begin in the fall…

Lily Lake was a natural lake before a dam was built on its eastern edge in 1915. The dam raised the lake’s water level about 4 feet, increased its surface area from 14 acres to 17 and increased its capacity from about 39 acre feet of water to 75. The lake was added to the park in 1991 after it was acquired and saved from development by the Conservation Fund in 1989. The park acquired water rights for the lake about 10 years ago. An agreement with the Estes Valley Land Trust requires the park to retain the water rights and maintain the dam in perpetuity, Baker said.

More Rocky Mountain National Park coverage here and here.

Reflections on the Colorado-Big Thompson Project — W.D. Farr

wdfarrcoloradobigthompsonprojectgreeleywater.jpg

Here’s a video with W.D. Farr explaining the origins of the Colorado-Big Thompson Project. Thanks to Greeley Water for posting the video.

Next year is the 75th anniversary of the 1937 act that established the water conservancy districts and the Colorado Water Conservation Board.

Farr explains that Congressman Taylor would not support the project unless Green Mountain Reservoir — for west slope supplies — was built first.

“The biggest cloud of dust I ever saw came out of that tunnel [Adams Tunnel],” Farr says, “I never saw men so happy in my life.”

More Colorado-Big Thompson Project coverage here.

Cool photo of the week so far: Long Draw Reservoir spilling in 2010

A picture named longdrawreservoirspill2010

We love a good reservoir spilling photo here at Coyote Gulch. Here’s a picture of Long Draw Reservoir spilling in 2010. Click on the thumbnail graphic to the right for a larger view.

Fort Collins: Rocky Mountain National Park public meeting seeking input on possible restoration of Grand River Ditch breach Thursday

A picture named grandriveditchbreechlulucreek.jpg

From the Fort Collins Coloradoan (Bobby Magill):

The federal government sued the ditch owner, Fort Collins-based Water Storage and Supply Co., demanding compensation for the damage. A settlement was reached in 2008. Since then, park officials have been working with Colorado State University to gain a better understanding of the ecology of the area and how to return it to its natural state. The park is now turning to the public to comment on which of the five alternative reclamation plans works best before a final decision is made in late 2012. Those interested in voicing their concerns about the project have until Nov. 1 to do so and can meet with Rocky Mountain National Park officials to discuss the environmental impact of the reclamation process…

The National Park Service’s public meeting on Grand Ditch repairs will be at 7 p.m. Thursday inside the Café Columbine conference room, 802 W. Drake Road, Fort Collins.

More Rocky Mountain National Park coverage here and here.

Long Draw Reservoir operations update

A picture named longdrawreservoir.jpg

From the Fort Collins Coloradoan (Kevin Duggan):

Fort Collins-based Water Supply & Storage Co. plans to appeal a U.S. Forest Service decision released Sept. 3 that would make it fully responsible for implementing a 15-year plan to restore the greenback cutthroat trout in the reservoir and surrounding streams. The mitigation program’s cost could be considerably higher than the approximately $800,000 projected by the Forest Service in an environmental impact statement, said Dennis Harmon, general manager of the irrigation company. But even that figure would be more than the company should have to pay in order to keep its permit to operate the reservoir, which was built in 1929 and expanded in 1974. “We just think this is way out of line for something that is already permitted,” he said. “We haven’t changed how this facility operates since the ’70s. “We think this mitigation is more appropriate for a new reservoir in the wilderness than on 53 acres of existing reservoir.”[…]

An effort to renew a Forest Service permit for the expanded portion of the reservoir turned into a decade-long fight when Colorado Trout Unlimited sued in 1994 over a plan that would keep La Poudre Pass Creek dry during the winter. In 2004, a U.S. District Court threw out the permit, forcing the Forest Service to start the permitting process over and to come up with a plan that would protect trout habitat. The revised environmental study came up with a plan for restoring the greenback cutthroat trout to more than 40 miles of streams in and around Rocky Mountain National Park. The plan called for eliminating invasive fish species and building barriers to keep them from getting re-established in the Poudre headwaters. Trout Unlimited worked with Water Supply & Storage and other entities, including the Colorado Division of Wildlife, to come up with a way to fund the mitigation program, which would be the largest native trout restoration project in state history.

But the decision by Glenn Casamassa, supervisor of the Arapaho and Roosevelt national forests, puts the responsibility for funding the restoration program on Water Supply & Storage because it holds the permit for the reservoir…

The National Park Service is expected to release its record of decision on the project within the coming weeks, said Larry Gamble, chief of planning and compliance for Rocky Mountain National Park. The decision will mirror the directions laid out by the Forest Service, he said.

More Cache la Poudre River watershed coverage here.

Colorado-Big Thompson Project update

A picture named carterlake

From email from Reclamation (Kara Lamb):

I hope everyone is enjoying the full reservoirs we have this spring. As most of you already know, Carter and Horsetooth are each only a couple of feet down from full. Horsetooth remains at a water level elevation of 5427; Carter is at an elevation of 5757.

We are anticipating these higher levels for a little while, although now that it is starting to get hot, we also anticipate we will start seeing water users begin to pull water from both reservoirs. Some water has already been going out of Carter. Although we had initially projected it would not come on for a few more weeks, we will actually resume pumping water to Carter tomorrow, Friday June 25.

Also, for more information on Horsetooth and Carter reservoirs, please visit our new Webpage. Bookmark it! www.usbr.gov/gp/ecao/horsetooth_carter/index.html.

More Colorado-Big Thompson coverage here.

Grand County ‘State of the River’ meeting recap

A picture named coloradorivergranby.jpg

From the Sky-Hi Daily News (Tonya Bina):

Colorado River Basin snowpack levels are at 77 percent of average, in line with statewide averages this year, according to information shared at the annual State of the River Meeting. “It’s been a poor year until recently,” said Senior Water Resources Engineer Don Meyer of the Colorado River District to a roomful of water stakeholders Tuesday at the Mountain Parks Electric meeting room in Granby…

Forecasted elevation of Lake Granby is expected to be at 8,268 feet, according to Andrew Gilmore, hydraulic engineer with the Bureau of Reclamation, the agency that operates the Colorado-Big Thompson project. That level equates to about 12 feet from full. But Don Carlson of the Northern Colorado Water Conservancy District, the agency that delivers water to Northeastern municipalities, water districts, industries and farms, had a slightly less conservative prediction for Granby Reservoir. Because of moisture on the East Slope, Northern may be able to use some of its low priority rights for water, he said, which will take some pressure off of West Slope supplies this year. Granby Reservoir may be closer to 4 to 5 feet below full, he said…

Snowpack has “been behind all year, although did make a nice recovery recently,” said Bob Steger, Denver Water’s manager of raw water supply. “The good news is, we think we’re going to fill all of our reservoirs anyway, despite the low snowpack.”[…]

State of the River

The Colorado River District, which operates Wolford Mountain Reservoir is extending its offering of bounty for anglers who catch northern pike, a predator to native species. Anglers will be awarded $20 for each Pike caught.

• Northern and the Bureau of Reclamation are planning to replace the dam structure between Shadow Mountain Reservoir and Grand Lake this year. The dam/bridge at the eastern end of the canal is old, doesn’t perform well and poses safety concerns to boaters, said Northern’s Don Carlson. To avoid Grand Lake’s heavy summer traffic season during which many boaters use the canal, work on the dam project is planned for 30 days during the month of October.

• Pumping started at Windy Gap near Granby on April 29 to send 15,000 acre feet for storage to partners in northeastern Colorado, with another 40,000 acre feet from Lake Granby for their use.

• During the 25-year anniversary of the Windy Gap Reservoir, water will be taken down in mid-July through the end of September to address sediment build-up. Although sediment has been building up through the years, the reservoir was further impacted by a pond breach last year at the Orvis Shorefox property, which added silt to the reservoir.

• Denver Water customers are conserving more water due to a tiered rate structure that increases with increased water use per gallon. Graphs show that since Denver Water implemented its new rate structure, water use has plateaued even though the utility’s customer base has increased.

• Denver Water is redoing the outlet works at Williams Fork Reservoir and constructing a new auxiliary power plant at a cost of $17 million. The new outlet works should increase the capacity from 275 cfs to 750 cfs when completed. In the meantime, this summer the dam will operate with temporary outlet works with limited release capabilities, at 125 cfs. “We’ll get through this year as best we can with the limited release capabilities,” said Denver Water’s Steger.

• At the Vasquez Canal, Denver Water is replacing 1,500 feet of covered canal with pipe.

• There were several temperature exceedances in the Fraser River last year, according to the Grand County Water Information Network. They were upstream from Windy Gap and at the conjunction of Ranch Creek, she said. As many as 32 temperature monitoring sites will be in place again this year. Through partnerships, algae toxin monitoring and gathering of water clarity data will also continue at reservoirs and lakes this summer.

More Colorado River Basin coverage here.

Moffat Collection System Project: Corps Denver hearing recap

A picture named eisenhowerfishing.jpg

The Fraser River of the 21st century is much different from the river that former President Eisenhower used to fish back in the day. Low flows due to transmountain diversions have diminished the fishery there.

The U.S. Army Corps of Engineers held a hearing last night in Denver for Denver Water’s Moffat Collection System Project which would divert additional water from the Fraser watershed. Residents, planners and politicians (many from Grand County) showed up to be heard. A majority of the speakers asked for the comment period to be extended 45 days.

Speakers for the most part voiced opposition to the proposed Denver Water expansion of Gross Reservoir and the increased diversions to fill the new space. The hope is to raise the dam 125 feet or so to get another 18,000 acre-feet of firm yield on the north side of their service area. They also hope to build a new reservoir on Leyden Creek.

“It breaks my heart to see a natural environment disappear while the east slope creates an environment that belongs east of the Mississippi River,” said Fraser resident Kirk Klanke during the hearing.

He also voiced support for an extension of the comment period. The EIS is a couple of thousand pages and many of the speakers said that they’ve not had enough time to probe the proposed workings.

Canton O’Donnell wants the Corps to evaluate the Moffat project in conjunction with the proposed Windy Gap Firming Project. Windy Gap is the Northern Colorado Water Conservancy District’s plan to increase municipal supply for the Front Range using the Colorado-Big Thompson project to transport water stored downstream of Granby Reservoir. One speaker asked the Corps to hold off on issuing permits for either the Windy Gap Firming Project or the Moffat Collection System Project until Denver Water and the Northern Colorado Water Conservancy District come up with their plan to coordinate the two projects to minimize impacts to the headwaters area.

“If your house is on fire and you have two bedrooms you’d want the fire department to take care of both,” said 4th generation Grand County rancher and county commissioner Gary Bumgarner in support of consolidating the environmental impact statements for both projects.

“This is a very bad project for many reasons,” said Grand Lake Mayor, Judy Burke, while reminding the Corps that pumping warmer water upstream to Grand Lake is causing algae blooms in the lake.

The Colorado-Big Thompson project moves water from Granby Reservoir, through Shadow Mountain Reservoir and into Grand Lake for transport under the Continental Divide through the Adams Tunnel. The Windy Gap Firming Project would increase the volume of water pumped up to the Adams tunnel so presumably the lake clarity problem will increase along with lowered water quality.

Whitewater enthusiasts oppose the drowning of the reach of South Boulder Creek just above Gross Reservoir. One commenter called it a, “Premier whitewater run.”

Interested parties have one more chance to speak publicly on the project next week in Keystone. Here’s the release from Denver Water with details about the hearings.

More Moffat Collection System Project coverage here.

National Ecological Observatory Network may build two climate monitoring stations in Rocky Mountain National Park

A picture named longspeak.jpg

From the Fort Collins Coloradoan (Bobby Magill):

The National Ecological Observatory Network, or NEON, is proposing to build two climate monitoring stations at the park. One may be built on the west side of Colorado Highway 7 south of Goblins Castle Road, and the other is being considered for a site in Glacier Creek near the Sprague Lake Picnic Area. At the Goblins Castle site, a 59-foot tower would be built to house monitoring equipment, while water sampling equipment would be installed in Glacier Creek.

More Rocky Mountain National Park coverage here.