Pueblo West is applying to water court to move discharge point in order to store effluent in Lake Pueblo

A picture named puebloreservoir.jpg

From The Pueblo Chieftain (James Amos):

Pueblo West wants to change how its wastewater is released so that it can claim more return-flow credit for it. That would allow the district to reuse the water by collecting it again at Pueblo Dam. The water rights that supply Pueblo West come from the Western Slope, so the water can be used over and over, either physically or through exchanges of return-flow credits. Right now, Pueblo West releases treated water from its sewage-treatment plant through Pesthouse Gulch and Wildhorse Creek to the Arkansas River. That journey uses up a lot of the return-flow water by evaporation and feeding plants that grow along the gulches. Pueblo West gets return-flow credit for only 31 percent of the water that leaves the wastewater plant, Harrison said. If Pueblo West can pipe that water four miles west and release it down Golf Course Wash to Pueblo Reservoir, it can claim return-flow credit for as much as 98 percent of the water. Water rights are getting scarce in the Arkansas Valley, and Harrison said it may not be possible to buy the 3,400 acre-feet of water the “Pumpback Project” is expected to save the district. It’s enough water to supply thousands of new homes, he said.

More Pueblo West coverage here.

Leave a Reply