Fryingpan-Arkansas Project update: 500 cfs in the Fryingpan River through Basalt

A picture named fryingpan.jpg

From email from Reclamation (Kara Lamb):

Just a quick note: We reduced releases from Ruedi Dam to the Fryingpan River by 150 cfs today. Tomorrow, Friday, we will do the same. As a result, by Friday evening, there should be less than 500 cfs flowing through Basalt.

More Fryingpan-Arkansas Project coverage here.

Leave a Reply