Pitkin County commissioners line up with others to oppose the conditional rights for dam on the Crystal River

crystalriver.jpg

From the Aspen Daily News (Andrew Travers):

The rights are held by the Colorado River Water Conservation District and West Divide Water Conservancy District. They have been renewed every six years since 1958, when the rights were issued by the U.S. Congress. Over the decades, the plan has included reservoir rights that would have flooded Redstone and covered it with a reservoir larger than Ruedi at nearly 200,000 acre feet. In the most recent iteration of the plan, the reservoir to drown Redstone has been dropped but another, smaller reservoir upstream toward Marble remains.

County attorney John Ely described the project as “wholly inappropriate” and said it “would do great harm and is probably located in the worst geological location possible.” The probability that the water groups would act on the plan is low, Ely added. But getting the concepts off the state books should be a county priority, he added. The plan currently headed for renewal aims to use the Crystal dam for hydroelectric power. The commissioners voted 5-0 to oppose the plan in state water court.

More Crystal River coverage here and here.

Leave a Reply