The U.S. Army Corps of Engineers is taking a hard look at managing the Missouri mainstem — hearings start June 1 in Jefferson City, MO

A picture named missouririverbasin

Here’s the link to the website for the study. Here’s the pitch:

The Missouri River Authorized Purposes Study (MRAPS) is a broad-based, Congressionally authorized study to review the project purposes established by the Flood Control Act of 1944. The Study will analyze the eight authorized purposes in view of the current Basin values and priorities to determine if changes to the existing purposes and existing Federal water resource infrastructure may be warranted.

Thanks to missourinet.com for the heads up. From their article:

John Grothaus with the Kansas City District of the Corps says the first phase of the project is “public scoping” to get input from stakeholders and agencies, as well as members of the general public. “The first phase of the study, which is in some respects going to shape how we conduct our assessment of the existing conditions in the basin and how we shape the formulation of alternative plans. You know, what are people’s views what are their priorities?” Grothaus said.

The study will examine whether a 1944 federal law needs to be changed or revised from the eight set ‘purposes’ for the river, its dams and reservoirs.

“The fact that we’ve been granted this authority through Congress indicates that Congress feels like there’s some wisdom in looking at the purposes and seeing if any changes are needed or warranted,” Grothaus said.

Those eight purposes, outlined 65 years ago, are flood control, irrigation, hydropower, navigation, water supply, recreation, water quality, and fish and wildlife.

More Missouri River Basin coverage here.

Leave a Reply