From email from Reclamation (Kara Lamb):

We have another change at Green Mountain Dam. As has been typical the last six or so weeks, we are seeing operational changes at the dam about every three to four days.

In collaboration with other reservoir operators, we continue to follow Mother Nature’s storms, adjusting releases as we go. Recent rains have boosted flows in the Colorado River slightly, so we have been asked to cut back our releases from the dam to the Lower Blue.

Around 11 a.m. today, August 13, we cut back by 50 cfs, to about 330 cfs. The Lower Blue River should now be running at about 330 cfs.