From the Sterling Journal Advocate (Judy Debus):
A schedule of revised rates will be determined and presented at the next meeting as exhibits A and B of the previously tabled resolution. The rates will include a minimum charge based on meter size and a volume surcharge of 5 cents per 1,000 gallons beyond the minimum usage. The rate increases will be phased in over the next three years. For example, the proposed minimum charges for a 1-inch meter are $34 in 2010, $54.36 in 2011 and $67.97 in 2012. The minimum volume for a meter of that size is 2,000 gallons.
More infrastructure coverage here.
