From The Pueblo Chieftain:
The deadline has been extended from Friday to March 2 for comment on a new evaporation pond design, an on-site soil excavation and groundwater characterization plan and soil remediation criteria. In addition, public comment can be provided on a new document, dealing with a groundwater remediation water management analysis, which will be posted Friday at http://www.cdphe. state.co.us/hm/cotter/index.htm.
Comments should be submitted to Steve Tarlton, radiation program manager, Colorado Department of Public Health, 4300 Cherry Creek Drive South, Denver, CO 80246 or via email to steve.tarlton@state.co.us.