The State Engineer has approved the Rio Grande Water Conservation District’s annual replacement plan for groundwater Sub-district No. 1.
From email from the State Engineer’s office:
On May 1, 2012 State Engineer Dick Wolfe approved the Annual Replacement Plan for Subdistrict No. 1. This Approval was filed with the Division No. 3 Water Court.
All documents are located on DWR’s website at the following location:
http://water.state.co.us/DivisionsOffices/Div3RioGrandeRiverBasin/Pages/Division3EventsAndLinks.aspxNote: these documents can also be downloaded from the DWR’s FTP site:
ftp://dwrftp.state.co.us/dwr/ARP_Subdistrict1/
