@USBR: Releases Draft Environmental Assessment for Phase II of Piping Cattleman’s Ditches

Credit: Cattleman’s Ditches Pipeline Project II Montrose County, Colorado EIS via USBR.

Here’s the release from the US Bureau of Reclamation (Justyn Liff, Jenny Ward):

The Bureau of Reclamation has released a draft environmental assessment on Phase II of the Cattleman’s Ditches Piping Project located in Montrose County, Colorado. The project would replace approximately 6.1 miles of open irrigation ditch with 5.1 miles of buried water pipeline. The purpose of the project is to reduce salinity loading in the Colorado River Basin.

The draft environmental assessment is available online at http://www.usbr.gov/uc/envdocs/index.html or a copy can be requested by contacting Reclamation.

Reclamation will consider all comments received by September 15, 2017. Submit comments by email to jward@usbr.gov or to: Ed Warner, Area Manager, Bureau of Reclamation, 445 West Gunnison Ave, Suite 221, Grand Junction, CO 81501.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s