The latest “E-Newsletter” is hot off the presses from the Hutchins Water Center

Click here to read the newsletter. Here’s an excerpt:

MODELING THE COLORADO RIVER
A new white paper on present and future strategies for modeling the Colorado River has been released by Utah State University’s Center for Colorado River Studies. Learn more here.

@USBR seeks public input on alternatives to reduce salinity and improve water quality in the #ColoradoRiver #COriver

Paradox Valley Location Map. Credit: Bureau of Reclamation

Here’s the release from the Bureau of Reclamation (Justin Liff, Lesley McWhirter):

The Bureau of Reclamation is seeking public input on alternatives to reduce salinity in the Colorado River from sources in the Paradox Valley in western Colorado. Currently, the Paradox Valley Unit (PVU) in Montrose County, Colorado, is intercepting naturally occurring brine and injecting it 16,000 feet underground via a deep injection well. The PVU began operating in 1996 and is nearing the end of its useful life. The United States has a water quality obligation to control salt in the Colorado River, in compliance with the Colorado River Basin Salinity Control Act, the Clean Water Act, and a 1944 treaty with Mexico.

“The Paradox Valley Unit is a cost-effective salinity control project in the Colorado River Basin as it prevents 95,000 tons of salt annually from reaching the Dolores River and eventually the Colorado River—that’s approximately 7% of total salinity control occurring in the basin,” said Area Manager for Reclamation’s Western Colorado Area Office Ed Warner. “Reducing salt in the rivers improves water quality, crop production and wildlife habitat in the basin.”

Reclamation is preparing an Environmental Impact Statement and has released a draft for public review and comment. Alternatives analyzed in the draft EIS include a new injection well; evaporation ponds; zero liquid discharge technology; and no action, which would result in no salinity control in the Paradox Valley.

The public is invited to attend public meetings to learn more, ask questions and provide comments. Two public meetings will be held on:

– Tuesday, Jan. 14, 2020 in Paradox, Colorado at the Paradox Valley Charter School, 21501 6 Mile Rd., at 5 p.m. – Wednesday, Jan. 15, 2020 in Montrose, Colorado at the Holiday Inn Express & Suites, 1391 S. Townsend Ave., at 6 p.m.

The draft Environmental Impact Statement is available online at http://www.usbr.gov/uc/progact/paradox/index.html or a copy can be requested by contacting Reclamation.

Reclamation will consider all comments received by 11:59 p.m. Mountain Standard Time on Feb. 4, 2020. Those interested may submit comments by email to paradoxeis@usbr.gov or to Ed Warner, Area Manager, Bureau of Reclamation, 445 West Gunnison Ave, Suite 221, Grand Junction, CO 81501.

Paradox Valley via Airphotona.com

Bozeman construction firm chosen as Chimney Hollow Reservoir contractor — The Loveland Reporter-Herald

A view of the location of the proposed Chimney Hollow dam and reservoir site in the foothills between Loveland and Longmont. The 90,000 acre-foot reservoir would store water for nine Front Range cities, two water districts and a utility, and is being held up a lawsuit challenging federal environmental reviews. Graphic credit: Brent Gardner-Smith

From The Loveland Reporter-Herald (Carina Julig):

Montana-based Barnard Construction Inc. has been selected by the board of the Northern Colorado Water Conservancy District to build the Chimney Hollow Reservoir dam west of Carter Lake, the district announced in a press release Friday.

The Bozeman firm will enter into a $485.4 million contract to build the dam for the 90,000-acre-foot reservoir. The company has previous experience working on water infrastructure projects, including the Keeyask Generating Station in Manitoba and a reservoir in central Florida.

The firm was chosen from two price bids because it had previous experience with similar dams, had a strong safety record and offered the best value for its work, Northern Water spokesperson Jeff Stahla said…

Construction could begin as early as May, the release said, and is expected to take four years. The material for the dam will be quarried from the property that will house the reservoir…

Barnard Construction will also build a 40-foot-tall saddle dam at the south end of the valley, opposite from the main dam at the north end, which will significantly increase the amount of water that the reservoir will be able to store.

As part of the permitting process for Chimney Hollow, Northern Water is also building the $18 million Colorado River Connectivity Channel in Grand County to the west of the Continental Divide. The channel is an environmental enhancement and mitigation project that will connect ecosystems above and below the Windy Gap Reservoir, just west of Granby.