
From The Pueblo Chieftain (Chris Woodka):
A study that could lead to building a flood-control dam on Fountain Creek stalled Wednesday over the question of how it might affect water rights. Determining if water rights could be protected would be the first task in the study, Fountain Creek Watershed Flood Control and Greenway District Director Larry Small explained to the Arkansas Basin Roundtable.
“The prime objective is to evaluate whether water rights could be protected if a dam is built,” Small said. “There would be regular meetings with water rights holders to resolve the conflicts.”
That didn’t sit well with several members of the roundtable, who argued that junior water rights could be harmed if floodwater were held.
“I cannot imagine storage on Fountain Creek unless John Martin Reservoir were full,” said Jeris Danielson, a former state engineer who now heads the Purgatoire River Water Conservancy District. “It could mean a great deal of water lost to junior water rights holders, and I have a problem with the roundtable providing something that could damage the Arkansas River Compact.”
Otero County farmers John Schweizer and Vernon John Proctor both made the point that the Fountain Creek district does not have water rights to hold back any water.
Several other members of the board suggested that no part of the Fountain Creek study should go forward until the water rights question is answered.
Alan Hamel, who represents the Arkansas River basin on the Colorado Water Conservation Board, said the farmers were ignoring the potential danger to agriculture from a flood on Fountain Creek.
“I support this grant application,” Hamel said. “You just have to look at all the ditch headgates that were lost in Northern Colorado last fall.”
The roundtable moves projects ahead only if there is consensus, so the application was denied. A revised application still could be considered.
The study would build on a U.S. Geological Survey study that determined either a large dam on Fountain Creek or a series of detention ponds south of Colorado Springs would be the best protection for Pueblo of a 100-year flood on Fountain Creek. The USGS study, however, did not identify where a dam would be built or determine other factors such as engineering obstacles or water rights. The Fountain Creek district is trying to answer those questions prior to the arrival of $50 million in funding from Colorado Springs. That money, dedicated to flood control projects that benefit Pueblo, is a condition of the Pueblo County 1041 permit for the Southern Delivery System.
The $220,000 study promoted at the roundtable included financial backing from Colorado Springs Utilities, the Pueblo Board of Water Works, Fountain, the Southeastern Colorado Water Conservancy District, Pueblo West and Security. It also had letters of support from city councils and county commissioners in El Paso and Pueblo counties.