It's official – the top of Intake No. 1 is now visible and the low lake level pumping station is now operational. The new low lake pumping station was completed in 2020 to ensure the delivery of high-quality water in Southern Nevada. Learn more at https://t.co/o0rJqlXiFX pic.twitter.com/vPqULBlrCb
— Southern Nevada Water Authority (@SNWA_H2O) April 26, 2022




Click the link to go to the SNWA Low Level Pumping Station website.