From the Sterling Journal-Advocate (Sara Waite):

Rob Demis of Hatch Mott MacDonald didn’t have good news when he gave an update on his company’s review of Sterling’s wastewater treatment plant during Tuesday’s Sterling City Council meeting.

The engineering firm, which was contracted by the city to look at what improvements will be needed at the plant, has been working on the review for three months, but they are still looking at the data and developing preliminary alternatives.

The company has identified two primary issues facing the city’s system: flooding and improvements necessitated by upcoming changes to regulations.

Demis noted that the system has experienced multiple flooding events at the headworks facility in the last five years, from flooding of the river and heavy rainfall events. The flooding damages to equipment and pumping, overloads the pumping system and treatment plant, overflows into the river and leads to violations of the city’s wastewater permit. Each event can cost around $50,000 to $75,000 to replace the damaged equipment.

Inflow and infiltration are the factors that lead to flooding. The water comes from leaky pipe joints, roof drain connections, leaky manholes, missing manhole covers — storm water coming into the waste water system — as well as leaky customer sewer lines and sump pumps, Demis said. He added that Sterling’s system is relatively old; the design life of pipes is about 50 years, so pipes that have been in the ground since 1966 or earlier are at the end of their useful life. “It’s now time to start thinking about fixing them, or at least trying to slow down the amount of leaks,” he said.

He showed a graph that looked at a significant rain event. Prior to the storm, the typical influent flow to the system was averaging about 1.7 million gallons per day. The rain event exceeded the system’s pumping capacity, so the total amount of inflow isn’t known, but Demis noted that for two weeks following the storm, inflow remained above average. He said that is due to infiltration from groundwater leaking into the sewer system.

Sterling needs a larger pumping capacity, and with it a larger pipe to carry the waste water to the treatment plant. Demis said the city also needs to put in 30 million gallons of storage so when there is above average flow, that water can be fed slowly into the treatment plant and allow the biological processes to occur, which prevents violations.

Changes to regulations as soon as next year will require additional processes at the treatment plant. In November 2017, Sterling will have to meet a Total Inorganic Nitrogen (TIN) limit of 10 mg/L of Nitrogen when discharging to the recharge basins, which it cannot do. By 2022, the city will face limits on nitrogen and phosphorus that it also cannot meet.

The city will need additional tanks and chemical systems for nutrient removal as well as new process equipment, and new clarifiers as the existing ones are at the end of their life. The new equipment will necessitate upgrades to the electrical system, and they will need to implement a process control system to ensure they are meeting the requirements.

Demis noted that nitrogen and phosphorus are popular fertilizers, and they promote the growth of algae, which can kill fish.

Demis told the council he would make further presentations as they complete analysis of the data and the options available to the city.

MCWC: Glenwood Springs Wastewater Treatment Plant Tour, April 27 #ColoradoRiver #COriver

From email from the Middle Colorado Watershed Council:

Have you ever wondered what happens to the dirty water from your shower, laundry and toilet after it goes down the drain? What about the runoff from lawns and gardens, and rainwater and car washing?

The Middle Colorado Watershed Council invites you to join us and the Roaring Fork Conservancy for a tour of Glenwood Springs’ wastewater treatment plant. Trent Mahaffey from the City of Glenwood Springs will give us an in-depth look at the process of treating wastewater and allow its safe return to our rivers and streams.

Treatment processes at the facility include extended aeration with aerobic digesters and oxidation ponds, with odor control provided by air ionization and circulation. Before all effluent is returned to the environment it is even disinfected though an ultraviolet process. Come join us for a free tour of this state of the art facility.

Location: Glenwood Springs Wastewater Treatment Plant, West Glenwood Springs. Find a map to the facility here.
Date: April 27, 2016
Time: 4:00pm-5:30pm
Cost: free
Registration Deadline: Registration is required by clicking here. The tour will be limited to 15 participants. For additional information, contact Dan at 970-389-8234.

This workshop is hosted by the City of Glenwood Springs in partnership with the Roaring Fork Conservancy and the Middle Colorado Watershed Council.

Glenwood Springs via Wikipedia
Glenwood Springs via Wikipedia

La Junta: “I think they [CDPHE] make this stuff up as they go along” — Joe Kelley

La Junta back in the day via Harvey-House.info
La Junta back in the day via Harvey-House.info

From the La Junta Tribune-Democrat (Bette McFarren):

Director of Water and Wastewater Joe Kelley led off Tuesday’s meeting of the Board of Utilities Commissioners. The design review on the new Wastewater Treatment Facility continues. “The State thinks there are more issues that need to be addressed before we can get to construction. I think they make this stuff up as they go along,” said Kelley. He referred to the fact that we have not only secured our loan, but are already in the process of paying it back with a rate increase. In addition, our regional efforts to build the Arkansas Valley Conduit now depend on additional federal legislation to allow the use of revenue from storage accounts to pay for state levels loans. “Without this legislation the AVC may not be financially feasible,” said Kelley.

On a smaller scale, the check valve for aeration blower #1 has been rebuilt and is now operational at the wastewater treatment plant. The water crew installed a new fire hydrant at the corner of Sixth St. and Colorado Ave…

The crew has installed a new primary service for the new Dialysis Center, which included new overhead primary, underground primary, vaults and meter pedestal. Service is ready to be energized.
New automated meters have been installed throughout the city. At the present, we are waiting for the next shipment of meters, said City Manager Rick Klein. Crews are reading meters since we currently have no meter reader.

Snowmass taxpayers asked to approve mill levy for wastewater treatment plant

Wastewater Treatment Process
Wastewater Treatment Process

From The Aspen Times (Jill Beathard):

Ballot measure 5A asks to increase the water district’s debt to $19.85 million, or a monthly tax increase of $1.89 per $100,000 of assessed value. The funds will go toward replacing the district’s current wastewater-treatment plant to comply with new federally mandated guidelines.

No one likes to pay more taxes, especially in a year when Snowmass Village property owners may be asked for more (the fire district is eyeing a new station and is currently weighing how to fund it). But by paying for it this way, the district hopes to avoid having to increase its rates in order to cover the costs.

The changes have to do with nitrogen and phosphorus removal in the treatment plant, district manager Kit Hamby said in a presentation at the April 4 Town Council meeting. Because of a mandate from the federal Environmental Protection Agency, the state of Colorado has established new discharge restrictions for sewer plants above a certain capacity, restrictions intended to improve stream quality.

Glenwood Springs-based engineering firm SGM is helping with the design of the new plant, and its current plan repurposes 75 percent of the currently facilities. However, the plant will still be getting a whole new building, and the current facility will have to continue to be operable while the new plant gets built…

Assuming the funding and design process moves forward as planned, construction will start next year and take 18 to 24 months. When asked at the council meeting about traffic impacts, Hamby acknowledged they will be significant…

SGM has estimated the project will cost about $19.8 million, said Joe Farrell, president of the water district board, at the meeting. The alternative to the mill levy is an increase in rates for water district customers, estimated at an 80 percent hike, and the board does not support that, according to a notice sent to voters.

Mayor Markey Butler asked about the penalties involved if the district didn’t move forward with the project. Hamby responded that the state can assess fees of $20,000 a day if it does not comply.

“Quite frankly, we don’t have a choice,” Butler said.

Ballots will go out to all registered voters in the Snowmass Water and Sanitation District over the next week. Completed ballots must be received by 7 p.m. May 3.</blockquote

EPA Announces $3.3 Million in Funding for Water Reuse and Conservation Research/Research will measure health and ecological impacts of water conservation practices

Here’s the release from the Environmental Protection Agency (Cathy Milbourn):

Today, the U.S. Environmental Protection Agency (EPA) announced funding to five institutions to research human and ecological health impacts associated with water reuse and conservation practices.

“Increasing demand for water resources is putting pressure on the finite supply of drinking water in some areas of the United States,” said Thomas A. Burke, EPA Science Advisor and Deputy Assistant Administrator of EPA’s Office of Research and Development. “The research announced today will help us manage and make efficient use of the water supply in the long term.”

Water conservation practices that promote water reuse are becoming increasingly important, especially in the western United States, where factors such as climate change, extreme drought, and population growth are decreasing water availability. To help promote sustainable water reuse, this research will evaluate how reclaimed water applications such as drinking water reuse, replenishing groundwater, and irrigation can affect public and ecological health.

EPA announced these grants in conjunction with the White House Water Summit, which was held to raise awareness of water issues and potential solutions in the United States, and to catalyze ideas and actions to help build a sustainable and secure water future through innovative science and technology.

The following institutions received funding through EPA’s Science to Achieve Results (STAR) program:

Water Environment Research Foundation (WERF) Alexandria, Va. to actively identify contaminant hotspots, assess the impact of those hotspots on human and ecological health, and quantify the impact of water reuse and management solutions.

University of Illinois at Urbana-Champaign Urbana, Ill. to develop a new framework to understand how adaptive UV and solar-based disinfection systems reduce the persistence of viral pathogens in wastewater for sustainable reuse.

Utah State University, Logan, Utah to assess the impacts and benefits of stormwater harvesting using Managed Aquifer Recharge to develop new water supplies in arid western urban ecosystems.

University of Nevada, Las Vegas, Nev. to quantify microbial risk and compare the sustainability of indirect and direct potable water reuse systems in the United States.

University of California Riverside, Riverside, Calif. to measure levels of contaminants of emerging concern in common vegetables and other food crops irrigated with treated wastewater, and to evaluate human dietary exposure.

More information on these grants is available at: https://cfpub.epa.gov/ncer_abstracts/index.cfm/fuseaction/recipients.display/rfa_id/591/records_per_page/ALL

artificialrechargeusgs2011

2016 #coleg: HB16-1256 update #ColoradoRiver #COriver

Lower South Platte River
Lower South Platte River

From The Durango Herald (Peter Marcus):

The bill would require the Colorado Water Conservation Board to study the amount of water that has been delivered over 20 years to Nebraska from the river in excess of the amount allowed under the South Platte River agreement.

The legislation was amended on Monday to require approval from the South Platte Basin Roundtable and Colorado Water Conservation Board before spending the $250,000 on the study.

In addition to studying water leaving the state, it would also examine possible locations for a reservoir along the river between Greeley and Julesburg.

Water officials will report back to lawmakers with findings.

The House Agriculture, Livestock and Natural Resources Committee backed the bill unanimously. It now heads to appropriations, where it is likely to survive, as funding would require approval from the basin roundtable and water board, and the $250,000 would come from existing severance taxes.

“We are depending on Western Slope water to continue to supply the growth on the Front Range, and the water’s just not there,” Brown explained of the intent of the bill…

While the South Platte represents only one basin, it impacts water across the entire state. There are 25 transmountain diversions, meaning water from rural Colorado is used for municipalities along the Front Range.

“Looking at these alternative supplies will help us meet our gap in the future without putting as much demand and pressures for additional supplies,” said Bruce Whitehead, executive director of the Southwestern Water Conservation District.

But the South Platte is only one component on an extensive wish list addressing water problems facing Colorado.

Lawmakers also heard this week about problems involving wastewater treatment facilities that need to be updated and toxic algae growth, such as microcystin, which is a liver toxin. The concern is when people are exposed during recreation.

But overshadowing the concerns is money.

Wastewater treatment facilities need about $4.5 billion and drinking water facilities need over $5 billion over the next 20 years.

“We’ve already said that we don’t have the money to pay for it, so these communities cannot meet those standards – what happens next?” Rep. Don Coram, R-Montrose, asked members of the Colorado Water Quality Control Commission, referring to water quality standards.

“This is a tough nut to crack,” responded Barbara Biggs, a member of the commission. “There isn’t funding for the infrastructure, and yet there’s tremendous pressure to protect the environment.”

Snowmass voters asked to approve bond for wastewater upgrade — The Aspen Times

Wastewater Treatment Process
Wastewater Treatment Process

From The Aspen Times (Jill Beathard):

Snowmass water customers will decide in May whether to fund an upgrade of their wastewater treatment plant through a mill levy.

The project, which the Snowmass Water and Sanitation District estimates it needs $19.85 million to complete, must be finished by spring 2020 to comply with new standards for water quality set by the Environmental Protection Agency. The water board decided at its meeting Tuesday to ask voters to approve a bond issue for the debt of the project, which it believes will be less of a burden on its customers than a rate increase.

To bring in the almost $20 million needed without the bond issue, the district would have to hike sewer service fees by about 80 percent, said District Manager Kit Hamby. The exact ballot language that will go before voters in May is being recalculated, but as of now, the district estimates that its tax collections would need to increase to $1.68 million annually.

“As a mill levy, voters can write that off on their taxes, but if we increase service fees, they can’t,” Hamby said. “We’d have to look at a different mechanism to fund this … if we don’t get this approved.”

Broomfield City Council approves $3.7 million wastewater facility expansion — Broomfield Enterprise

Wastewater Treatment Process
Wastewater Treatment Process

From The Broomfield Enterprise (Jennifer Rios):

Broomfield City Council gave the green light for the wastewater treatment facility to seek proposals for expansion to their laboratory and administrative office space.

Councilmembers unanimously passed six consent agenda items Tuesday night without discussion…

The Environmental Services Division in Public Works provides laboratory services to the Water and Wastewater Treatment facilities. The laboratories share staff, space and equipment between the two facilities to comply with all water and wastewater regulations in an efficient and cost effective manner.

“The laboratory at the water treatment facility, constructed in 1997, is adequately seized for the staff and work load,” a memo reads. “The laboratory at the wastewater treatment facility, constructed in 1987, has not been expanded to keep up with the additional staff and work lead increase over the last 28 years.”

The lab was built with work space for two staff member, and does not support the five employees and equipment added since 1987.

Burns & McDonnell, a Denver-based engineering firm, was retained in late 2014 to complete a study for the facility, east of Lowell Boulevard on West 124th Avenue, and determined the existing space was about half of the size that is typical for the staffing and testing performed at the facility.

Construction costs are estimated between $3.7 million to $3.8 million, according to a city memo. That amount is included in the 2016 budget.

State provides $9.4 million for small community wastewater and drinking water system improvements

Here’s the release from the Colorado Department of Health and Environment (Meghan Trubee):

Thirty-two drinking water and wastewater systems in small communities throughout Colorado will receive a total of $9.4 million to fund planning, design or construction of public water systems or treatment works necessary for the protection of public health and water quality.

Governmental agencies, nonprofit public water systems and counties representing unincorporated areas with fewer than 5,000 people were eligible to apply for grants up to $850,000. Funding was provided by the state Legislature under Senate Bill 09-165 and SB14-025.

In the event a recipient cannot accept the grant in whole or part, available funds will be distributed per the small communities grant program rules. This list is subject to change based on contract negotiations.

cpdheawardssmallwaterprojects

From The Pueblo Chieftain (Chris Woodka):

Three Pueblo communities are among 32 entities receiving $9.4 million in state grants for planning, design or construction of water projects.

The Colorado Department of Health and Public Environment announced the funding this week. It is available to small towns or water systems serving fewer than 5,000 people.

Boone, located east of Pueblo, will receive $850,000, which will be used to upgrade its water system.
The town is looking for an alternative source, because its wells suffer from water quality issues, said Mayor Robert Ferriter.

Rye, located southwest of Pueblo, will get $440,000 for its water system. The town has been improving its water system since 2009, when it was under a boil order.

The Avondale Water and Sanitation District will get $596,057 to make sewer improvements.

“We were happy to get it,” said Bert Potestio, president of the district. The grant will be matched by local funds and used to lift water to treatment lagoons. “We plan to start work as soon as possible.”
Several other area water and sanitation providers also are tabbed to receive funds. They include: Pritchett, $185,000; Manassa, $15,000; La Veta, $850,000; Manzanola, $253,328; Baca Grande Water and Sanitation, $88,300; Costilla County (Garcia Water), $99,816; Sheridan Lake Water Co., $609,568; Patterson Valley Water Co., $150,500; Fowler, $304,355; and Bristol Water and Sanitation, $94,500.

Cortez: Solids from county jail causing back ups

Wastewater lift station
Wastewater lift station

From the Cortez Journal (Tobie Baker) via The Durango Herald:

Montezuma County inmates are under suspicion, but not for unlawful activity.

Cortez Sanitation District officials suspect that inmates at the 104-bed Montezuma County Jail are flushing items in their jail cells, plugging a pumping station or contaminating the wastewater-treatment facility.

“We get a ton of Ramen noodle packages,” CSD manager Tim Krebs told board members at a monthly meeting last week.

Krebs initially relayed his concerns to CSD board members in December, reporting that plastics and other debris from the detention center had been an ongoing problem.

Vici Pierce, detention captain at the Montezuma County jail, confirmed that inmates were allowed to purchase Ramon noodles from the commissary, but said she was unaware of any sanitation district complaints until notified by The Journal.

“Garbage bags are provided in each unit, and inmates are instructed to use them for the disposal of their trash items,” Pierce said.

Several years ago, a garbage grinder was installed in the jail’s sewer system to help alleviate improper trash disposal.

According to Krebs, that grinder pump on Driscoll Street failed, and after it was repaired recently, sanitation officials started to observe bits of plastic in the district’s treatment facility on South Broadway about four miles south.

Krebs said the grinder pump was recently taken offline at the district’s request to help staff determine whether the inflow of debris could be minimalized.

“The smaller plastics have disappeared in parts of the plant, but now larger plastics are filling up the bar screen at the lift station,” Krebs said.

Krebs said sanitation crews now make two trips per day to the district’s north pumping station to manually clear a screen that captures the plastics. Officials indicated the screen was routinely plugged when crews responded.

Water district fights for relaxed quality standard — The Colorado Springs Gazette

Upper Black Squirrell Creek Designated Groundwater Basin
Upper Black Squirrell
Creek Designated Groundwater Basin

From The Colorado Springs Gazette (Ryan Maye Handy):

For years, the Cherokee Metropolitan District has failed to meet one of its water quality standards, and the eastern El Paso County water district has proposed a change in state regulations to make it easier to meet that requirement.

The proposal has started an unorthodox process with the state’s Water Quality Control Commission to allow the district to have a higher level of dissolved solids – like salt – in its water. The change would only affect wells in the district, but the proposal has raised concerns from well-owners about the health of the system’s aquifer and prompted three stakeholder meetings before a rulemaking hearing in August.

The Upper Black Squirrel Creek aquifer has already been degraded by the number of wells that tap into it, well owners argue. Wells in the Cherokee district pull from an aquifer that is recharged with treated wastewater – water that, under a new requirement, would have more dissolved solids. If Cherokee fails to change regulations for its so-called “total dissolved solids” levels, it will have to spend tens of millions of dollars to meet current state requirements – a cost that will be borne by the district’s ratepayers.

The problems date back to 2010, when a new waste water treatment facility was completed without machines to treat water for total dissolved solids, known as TDS. At a Tuesday stakeholder meeting, the first in a series, Cherokee’s General Manager Sean Chambers described the consequences of this to a group of around 30 people.

“So whatever comes in the waste water plant in terms of total dissolved solids comes out the other end,” Chambers said. “Thus, we have a $30 million waste water plant that does not treat a lick of TDS.”

The district’s drinking water quality more than complies with state requirements for dissolved solids levels, but the levels in waste water pose problems. The water district typically measures 600 mg per liter of dissolved solids in its treated waste water, well over the state requirement of 400 mg per liter, said Chambers. Ever since the district opened its new facility in 2010, it has never been compliant with state standards for dissolved solids. By changing the level allowed in its water, the district hopes to save $10 million on costs over the next 20 years while it tries to become compliant.

On Tuesday, the district emphasized that dissolved solids in its water do not pose a public health risk, but only affect the water’s taste. Most water districts around the country adhere to the federal standard of 500 mg per liter of dissolved solids, except for Texas, which has its threshold set at 1,000 mg per liter, said Andrew Ross, with the state’s water control commission.

While the water district is aiming for compliance, well owners fear that more dissolved solids will continue to degrade the quality of the aquifer, said Jerod Farmer, a well owner who attended Tuesday’s meeting. Officials with the water quality control commission acknowledge that a higher presence of those solids in water can impact the aquifer’s quality.

Unlike surface water, which is regulated for quality at the federal level, groundwater quality is regulated on a state-by-state basis. Colorado’s groundwater regulations have remained relatively unchanged since the 1980s, when two regulatory structures were set up- one for statewide regulation, and another to grant individual exceptions to the state’s rules.

The Cherokee district is unique in Colorado – it has the largest facility in the state that dumps its waste water back into the groundwater. Its request to change the dissolved solids requirements in its waste water is equally unusual – the water quality commission rarely handles regulatory changes proposed by an outside agency, representatives said on Friday.

The public will get two more chances to learn about the proposed changes at stakeholder meetings on Feb. 11, time and location to be determined, and March 10 from 1 p.m. to 4 p.m., location to be determined. Both will help the commission gather as much public opinion and information as possible before the August hearing, said Lisa Carlson, who facilitated Tuesday’s meeting.

“The hope is that, when you get to the hearing, you will all be well educated and understand what the issues are in the process,” Carlson told the audience.

Mosca sewage treatment update: “This is not the smell of money” — Gigi Dennis

Septic system
Septic system

From the Valley Courier (David Gilbert):

Long-awaited grant funding has finally come through to finance the construction of a sorely-needed sewage treatment system in Mosca.

Alamosa County officials recently received approval of a grant request from the state’s Department of Local Affairs, or DOLA, for $634,500, which will cover a sizeable chunk of the roughly $1.2 million price tag to replace the aging septic systems in the little town.

The balance of the project’s cost will come from a grant and loan package from the United States Department of Agriculture, or USDA.

The grants were won through a spirited and determined effort largely spearheaded by Alamosa County Deputy Land Use Administrator Rachel Baird and Code Enforcement Officer Jinger Tilden.

DOLA grants require the community requesting the money to match awards with funds from other sources, some of which must be loans to ensure that agencies have some “skin in the game.” The USDA package totals $810,000, of which $160,000 is in the form of a 40-year , 2-percent interest loan that will be paid back by users of the Mosca system.

The awards signal the beginning of the end of the lengthy saga of sewage problems in the town. The 55 users of Mosca’s current system mostly residences utilize 10 clustered septic tanks installed in the early 1980s, which must be regularly pumped out. Two of the tanks are critically damaged and require bi-weekly pumping. The tanks’ leach fields are so saturated that they are essentially non-functional , and the fields are only 50 feet from wellheads, which is less than the 100-foot minimum distance now required by code. The new treatment plant will be a modern system called a sequencing batch reactor, which uses oxygen and bacteria to digest waste.

Construction on the new plant is likely to begin in spring, and officials anticipate it will be on-line before the snow falls next year.

It will cost a little more than $24,000 a year to operate , including the salary for one maintenance person, as well as money set aside in an emergency fund. The annual cost is an improvement over the current system, which the county subsidizes at a cost of more than $30,000 a year. Payments by the system’s users often added up to only $7,000 a year.

The new system will be fully self-supported by its users. Households using the current system pay $25 a month. The fee to use the new system will be higher, but a final monthly figure hasn’t been arrived at, though it will be limited to a proportion of the town’s median income.

The system is designed to be low-maintenance , long lasting, and to allow for expansion and greater capacity. The shortest lifespan of any system component is said to be 75 years. Alamosa County officials have been seeking a solution to the problem since the mid-1990 s, but three previous attempts to secure funding from the state were rebuffed.

Meanwhile, problems in the town got steadily worse. Sewer lines to houses back up regularly. Cracked tanks leak sewage to the surface, causing a foul odor to hang over the town at times.

“They’re just ticking time bombs for a health crisis,” Baird said.

The Mosca sewage issue has been a “noose around the neck” of the county for a long time, said Alamosa County Administrator Gigi Dennis.

“This is not like Greeley and the stockyards,” Dennis said. “This is not the smell of money.”

Dennis commended the efforts of Baird and Tilden. “These two ladies have been quite tenacious,” Dennis said.

Eliminating the sewage problem leaves Mosca poised for growth, Baird said.

“It’s a well-positioned town,” Baird said. “It’s the closest town to the Great Sand Dunes. The employees might just live there if there weren’t consistent odor problems.”

Dennis agreed that the new system sets Mosca up for comfortable future development .

“If they get more businesses or homeowners who want to tap into it, they’ve got a safe system they can access,” Dennis said. Tilden said that many Mosca residents felt left out of the process that left them with the clustered tanks over 30 years ago, and that she and Baird strove to ensure thorough community input in the current effort. She stressed that the county will not leave Mosca residents holding the bag with the new system.

“The county’s going to help the community,” Tilden said. “We’re not giving up on them.”

Tilden said winning the award was thrilling.

“I started crying,” Tilden said. “Rachel screamed. It was so gratifying. They’ve been trying to figure this out since 1996, and it seems we’ve finally got it all squared away.”

Whiting Oil & Gas Corp sells saltwater disposal and fresh water transportation and storage system in Weld County for $75 million

Deep injection well
Deep injection well

From the Denver Business Journal (Ben Miller):

Whiting Oil & Gas Corp., a unit of Denver-based Whiting Petroleum Corp., has sold its Redtail saltwater disposal and fresh water transportation and storage system in Weld County for $75 million.

Whiting sold the system to BNN Water Solutions, a unit of Tallgrass Energy Partners of Leawood, Kansas.

The water system consists of 148,000-acre system consists of 62 miles of pipeline along with associated fresh water ponds and disposal wells.

State shortens selenium compliance period — The Pueblo Chieftain

Groundwater movement via the USGS
Groundwater movement via the USGS

From The Pueblo Chieftain (Chris Woodka):

The state has put Pueblo on a shorter leash for dealing with selenium in wastewater discharges.

On Monday, the Colorado Water Quality Control Commission rejected Pueblo’s plea for a 10-year extension of a temporary modification, instead just giving the city a little over two years to develop a discharge specific variance that sets numerical limits and strategies to attain them.

“Everyone, even the EPA, recognizes that selenium is naturally present in the Arkansas River,” said Gene Michael, Pueblo’s wastewater supervisor. “What we’ll have to do in the next two years is come up with an effluent limit and a compliance schedule.”

Pueblo already is implementing a $32 million project to line sewage collection pipes on the West Side to reduce infiltration of groundwater tainted with selenium.

The city’s position is that more of that selenium could reach the Arkansas River because it would not be removed in treatment.

“We still will be in negotiations with the state health department on selenium levels to determine standards,” Michael said. “The potential exists to extend the temporary mods as well.”

Another contaminant, sulfates, is also being looked at. But it may not be an issue, since there are few diversions of surface water for domestic use directly downstream from Pueblo, Michael said.

Water testing on Yampa River could lead to more regulations after reclassification — Steamboat Today

From Steamboat Today (Scott Franz):

City officials in Steamboat Springs say some high water temperature readings taken in the Yampa River just west of Hayden in recent years could soon lead to a big change in how a 57-mile stretch of the river is regulated by the state.

The stretch of the Yampa that runs from the confluence of Oak Creek south of Steamboat to the Moffat County border is poised to be listed by the Colorado Department of Public Health and Environment as an impaired waterbody.

City officials are concerned that the listing could eventually lead to some costly, multi-million upgrades to such things as the wastewater treatment plants that discharge water into the river.

They are questioning the methodology used to arrive at the listing and are hoping a proposal to monitor the health of the river in more areas will help municipalities along the river avoid costly new regulations.

“Given the variability of altitude, temperature, and aquatic life throughout the 57-mile segment, the City questions whether the standard applied to such a long reach is appropriate,” city officials recently wrote in a memo to the Steamboat Springs City Council.

Kelly Heany, the city’s water resources manager, said the Water Quality Control Commission will consider whether to list the Yampa as an impaired waterbody at its Dec. 14 meeting.

“It could potentially have a costly impact n the wastewater treatment plants in Hayden, Milner and ours,” Heaney said.

She said the added regulations could call for such things as the installation of expensive cooling towers at these wastewater treatment facilities.

The classification could also add more regulations to construction de-watering permits, industrial discharge permits and stormwater permits.

Heaney will attend the Dec. 14 hearing to outline the city’s plans and the extensive efforts it has undertaken already to protect the water quality of the Yampa.

Heaney said the city does not have enough temperature data from the entire stretch of the Yampa to oppose the listing on the impaired waterbody list.

So city officials are proposing to invest more in monitoring the quality of the Yampa at more locations to better understand what impacts the temperature changes.

Yampa/White/Green/North Platte river basins via the Colorado Geological Survey
Yampa/White/Green/North Platte river basins via the Colorado Geological Survey

Durango: City voters approve bond to remodel sewer plant

Durango
Durango

From The Durango Herald (Mary Shinn):

“It truly is the right decision,” said Mayor Dean Brookie.

The remodel is necessary to ensure the plant can continue to meet water-quality regulations, as Durango continues to grow.

At the beginning of 2016, the city can now hire a company to design the sewer plant’s remodel, which will take about a year. Construction of the $58 million project will take about 18 months, said Mary Beth Miles, assistant to the city manager. The project needs to be finished to meet the Feb. 28, 2018, deadline when the state will review the plant’s permit.

The other $10 million in debt, approved by voters, will be used for sewer-related projects, not necessarily at the plant.

Without voter approval to finance the plant, the city would have had to look at emergency rate increases and cash financing the project, city councilors said.

“(The vote) averted a significant potential additional increase in sewer rates that would have been required to make interim improvements to the plant,” Brookie said…

The opposition group that pushed for a “no” vote hopes the council will revisit the alternative locations, including Cundiff Park, a site near Sawmill Road Site or combine with the South Durango Sanitation District, said Jon Broholm, who helped organize the opposition.

However, the group has not come to a consensus on which site would be best, he said.

The city council has already spent about $100,000 on engineering studies to research moving the plant and found insurmountable technical, environmental and financial challenges, Brookie said.

In addition, the few acres of park land that could be gained by moving the plant would cost more than all the open space purchased by the city over 20 years.

“What could go there that’s worth costing the taxpayers $20 million?” Brookie asked…

Improvements to the plant are underway to make sure it does not violate water-quality standards, said Steve Salka, utilities director.

Construction on a basin at the park that separates sludge from water was finished last week for less than the estimated $500,000, he said.

He also needs to build new aeration basins for about $5 million to meet the state’s standards for ammonia, a chemical that is toxic to fish.

If the construction was not completed by 2018, the city could potentially violate its permit every day, he said.

Voters to decide Orchard Mesa Sanitation District’s future

sewerusa

From The Grand Junction Daily Sentinel (Greg Ruland):

Residents who live within the boundaries of the Orchard Mesa Sanitation District will vote Nov. 3 on a plan to shut down the 39-year-old district and transfer all of its sewer lines, pipes, fittings, taps, valves and controls to the city of Grand Junction as of Dec. 31…

In the unlikely event voters fail to approve the plan, the district will continue to operate as it has since 1976, according to a contract negotiated between the city and the district in 2004.

The 2004 contract resolved a longstanding conflict over the use of fees the district paid the city to process a portion of its sewage, district officials said.

“The board decided it was the best deal we would could get for the ratepayers,” said Deborah Davis-Heidel, district manager since 1982.

Approval of the dissolution plan required by the contract will save district residents about $12 a year on their sewer bill, Davis-Heidel said.

It could also result in immediate improvements. Cash reserves and proceeds from any property sold by the city within two years of the transfer must be spent “exclusively” on capital improvements for district infrastructure, according to the plan.

For example, the sanitation district’s headquarters at 240 
27¼ Road — a 1,500-square-foot office building on slightly more than a half-acre — is expected to be sold in July, she said.

The plan also requires the district to continue billing ratepayers until October. It must transfer all of its billing records to the city by July. The three months between July and October will give the city the time it needs to write new software that syncs the district’s billing records with the city’s, Davis-Heidel said. After October, the city will take over billing.

Voter approval also means two longtime employees, Davis-Heidel and billing secretary Debra Kuhn, will lose their jobs and several independent contractors will lose a reliable, paying client. Attorney Larry Beckner, engineer Steve LaBonde, line cleaner Thomas Gund, construction contractor Mike Kelleher, and auditor Jeff Wendland will lose the district’s business as result of the transfer.

The district’s board of directors approved the dissolution plan in April before City Council approved it in July. In November, voters get their chance to approve or not, Davis-Heidel said.

Board members and staff of the district are prohibited from campaigning for or against the ballot issue, Referred Measure A, she said.

Davis-Heidel expects Referred Measure A to pass. At age 62, she is updating her resume for the first time in 37 years. She’s hoping to sign on with a sanitation district in a mountain town somewhere along the Continental Divide. At least one head hunter has already expressed interest, she said.

She called the district “my first child” and detailed how over nearly four decades it built and then updated and improved sewer lines for hundreds of homes in several Orchard Mesa neighborhoods.

The district spent about 
$1 million in the past five years to upgrade all of its lines prior to the handoff and will have retired all of its debts — including the original bond issue that built the system — before the end of the year, she said.

“We’re leaving the system in better shape than we found it,” she said, crediting the district board with wise stewardship.

Septic disposal site in Carr draws opposition

CarrCOPostOffice
Post Office in Carr, Colorado via Wikimedia

From The Greeley Tribune (Catherine Sweeney):

A proposed septic storage site has caused a big uproar in a tiny Weld County community just south of the Wyoming border.

Sullivan Septic & Excavating, based in Mead, is trying to store sewage from Weld, Boulder and Larimer counties in tanks and on fields in Carr, an unincorporated community of only a few hundred people.

Residents have banded together to write petitions, submit letters and emails and turn out for permit meetings.

Their most prominent fear is the sewage will harm their water quality, both in the nearby streams and surrounding groundwater wells.

“If it destroys our wells … we can’t do anything,” said Mary Fenwick, one of the residents opposing the project.

They also fear air quality and odor problems, tank quality control and traffic issues.

Cynthia Sullivan, who owns the 21-year-old company with her husband, Kevin, said they pitched the project in Carr because they own 240 acres there.

They also already have three 20,000-gallon tanks on site and had to file for a permit with the planning department to start filling them, according to planning commission documents. They also have to file for a permit with the Weld County Health Department to spread the sewage over a field.

They haven’t done so yet, said Director of General Services Trevor Jiricek.

He helps the health department oversee regulations like this.

Applying waste to farmland is somewhat common in Weld County. There are two types of sewage that can be applied: septage and biosolids. Septage (what the Sullivans are trying to store) comes from septic tanks. It’s screened, which means it has plastics and other materials that aren’t biodegradable removed. Biosolids come from waste water treatment facilities. They’re screened, too, but they’re also treated afterward in various ways, which can include chlorination or aeration. Both kinds of waste can be spread over fields.

This practice isn’t only for storage.

“Land applying septage and biosolids is for its beneficial value,” Jiricek said. “It’s like fertilizer.”

In a given year, the health department grants from 180-200 biosolid application permits and maybe a handful of septage permits, he said. This isn’t a year-round process.

“There’s not 200 active sites at a time in our county ever,” he said.

Applying both biosolids and septage is usually a one-and-done deal, not something that happens continuously.

The county commissioners’ vote in a little less than two weeks will ultimately decide whether they can use the tanks. Because the case is ongoing, the commissioners declined to comment on it.

The planning commission, which acts as an adviser to the county commissioners, approved the project 7-2 in September. One of the “no” voters, Gene Stille, said he is familiar with the area and has concerns about water quality effects, according to planning commission documents.

From the beginning, residents have opposed the project.

“All we had was like two days before the meetings to get this organized,” Fenwick said.

Before the meeting, the planning commission received 35 letters and emails against the project. More than a dozen residents attended the meeting, and seven spoke against it.

During the meeting, commissioners added conditions to the permit request, such as required leak detection, and talked with engineers about how to mitigate potential damage.

“They never answered a single question (from residents),” Fenwick said. “They didn’t even ask our opinion, if that was going to satisfy us.”

The residents learned about the project from a notice on a lightly used back road. Fenwick said she thinks they should have put the notice in the post office, where more Carr residents would have seen it.

That’s not what the law calls for, said County Attorney Bruce Barker. It calls for a notice to the adjacent property owners, in the paper and on the property where the project is slated to go.

“They were thinking there should have been notice to — to my impression — everyone in Carr,” Barker said.

The septic storage would be the next link in a chain of industrial permit approvals in Carr, which residents have lamented.

“We moved here about six years ago, and there was nothing around here,” Fenwick said.

She said the only disturbance her family faced was the occasional train. In the past few years, gravel excavators and oil and gas sites have come.

Residents have various complaints about those, but the old developments aren’t their concern right now.

“This latest deal is the one that’s got us all upset,” she said.

The other sites can be loud and generate dust, but those grievances pale in comparison to worries they have about the danger posed to their water supply, she said.

Although she and the other residents plan to continue fighting the project with fervor, she said she doesn’t believe county officials will take their side because of all the projects approved in the past.

“We all have a big investment in our homes and trying to make our community better, and we just keep getting slapped in the face,” she said.

Children’s World Water Day activities at Littleton-Englewood treatment plant

littletonenglewoodplantbrowncaldwell

From the Centennial Citizen (Tom Munds):

Excited laughter and conversations among young voices created a different atmosphere at the Littleton/Englewood Wastewater Treatment Plant as more than 500 students from Englewood, Littleton and Denver made a field trip there for World Water Day activities.

“We have expanded the event this year and have more students attending it,” said Brenda Varner, plant employee and event coordinator. “We have gotten help in expanding the event from a number of agencies that are providing volunteers and displays. Each school’s student group is scheduled to visit every station. The stations provide the opportunity to check out displays, listen to presentations and do hands-on activities. I am sure one of the more popular hand-on activities will be at the booth where each student can create a special T-shirt.”

She said the school groups arrived at different times Sept. 23. Each group then followed a schedule from station to station.

Sixth-graders from Littleton Preparatory Charter School took part in the event. At one of the tour stations, Lily Stinton and other Littleton Prep students were divided into small groups and ran a number of tests on water from the South Platte River.

“I am learning a lot of things I didn’t know about water,” Stinton said. “I am learning about what has to be done to water so it is safe for us to drink. I am glad I came today.”[…]

Fellow student Charles Childers said it was fun testing river water.

“The water looks OK when you have it in the flask,” he said. “Then with the tests and the displays you learn about all the stuff that is in the river and in the river water. I didn’t know much about the river and the water in it so it is cool to learn about those things.”

Durango: City needs to pump $4 million into water and sewer infrastructure

Durango
Durango

From The Durango Herald (Mary Shinn):

While it is not likely all the projects will make the city’s 2016 budget, Utilities Director Steve Salka on Tuesday made a strong case for many of the maintenance projects to the Durango City Council.

The intakes on both the Florida and the Animas rivers, a foundation piece of the system need to be upgraded. Some of the intakes on the Florida are almost 100 years old.

On the Animas River the city needs to install improvements to ensure enough water flows to the intake.

This intake is located near the Durango Whitewater Park, and the park has exacerbated a problem with the way the water flows through the channel. Right now, not enough water is flowing over the intake, Salka said.

The construction fix for the problem is estimated to cost about $250,000, and the Durango Parks and Recreation Department may contribute $100,000 to the project, he said.

This will help make sure the department is ready to rely more heavily on the Animas River during maintenance on Lemon Reservoir, which stores Florida River water. Work will be ongoing at the reservoir from August of 2016 through 2017, he said.

This likely won’t be the only construction in the Animas next year because the Utilities Department is also planning to replace four of the pipelines that cross beneath the river. These pipes are about 50 years old.

Many of the other projects Salka has planned focus on stainability at water-treatment plant and in other parts of the system.

Some of these projects include better insulation and variable-frequency drive pumps to reduce their demand for electricity.

He would also like to install larger compressors that would help eliminate the need for them to turn on and off constantly; this would address noise complaints from the Hillcrest neighborhood.

Eventually, Salka plans to install a solar garden that would fund the entire plant. But before the solar panels can be installed the La Plata Electric Association must install new equipment, and this project is not currently slated to happen in 2016…

The department will continue replacing water meters again the year by installing 300 new ones.

City crews have replaced 600 meters over the last two years, and it’s had a positive effect on the system.

“My revenue starts going up; we get more water accountability,” Salka said.

In dealing with the sewage system, Salka proposed $1.8 million in upgrades that will needed no matter what decision is made on the wastewater-treatment plant.

Councilors are debating whether to move the plant or renovate it at its current location in Santa Rita Park.

Pueblo asks for more time to meet water quality standards

Wastewater Treatment Process
Wastewater Treatment Process

From The Pueblo Chieftain (Chris Woodka):

The city of Pueblo laid out its case for more time to study which methods of reducing contaminants, especially selenium, in wastewater to state and county officials Friday.

“The city’s approach is not just a study, but an adaptive management program,” said Gabe Racz, the city’s attorney for water quality issues.

Pueblo plans to ask the Colorado Water Quality Control Commission in December for an extension of temporary modification for discharges from the sewage treatment plant east of Pueblo. The city wants three years to meet sulfate standards and 10 years for selenium levels.

There are complicated, interrelated processes that need to be implemented in order to meet new federal standards for selenium, ammonia and nutrients, said Gene Michael, wastewater director for Pueblo.

Durango: Councilors hope to get $68 million wastewater funding issue on fall ballot

Wastewater Treatment Process
Wastewater Treatment Process

From The Durango Herald (Mary Shinn):

Durango city councilors plan to finalize ballot language Tuesday that will ask voters in November to approve spending $68 million on moving the sewer plant, but councilors haven’t decided where to put it, and voters likely will not know, either.

The deadline for completing the ballot question is a week away. If councilors agree Tuesday on what to ask, it will keep the timetable for construction intact while giving councilors time to consider options for moving the plant out of Santa Rita Park.

“We’re not in a hurry to pick a site,” Mayor Dean Brookie said.

If councilors don’t approve the question by Friday, it can’t be placed on the November ballot, and the project would be delayed by at least a year. Brookie is hopeful councilors will have a location identified before the debt question goes to voters.

City officials say they have looked at every possible parcel where a new sewer plant could go without finding a viable alternative to its current location in Santa Rita Park, and they are on a tight timeline to build a new plant that will meet state regulations.

But critics say there must be other options that haven’t been pursued.

Councilors considered a resolution earlier this month that would have formalized their intent to remodel and slightly expand the existing plant. But after hearing extensive public testimony, they decided to wait to pick a site to see if other options could be found. The same resolution could be back on Tuesday’s agenda.

Without knowing where the sewer plant will be located, it may be difficult to tell voters how much it will cost.

The Santa Rita Park plant remodel would require an estimated $58 million, and the city plans to ask for an additional $10 million in contingency money that could be used for the plant or other infrastructure projects.

If the city finds the ideal site for a sewer plant after the ballot language is approved, the city would have to go back to the voters if the project were to cost more than the $68 million, City Manager Ron LeBlanc said.

EPA and Navajo Nation EPA Enter Historic Agreements with Navajo Tribal Utility Authority to Halt Water Pollution

Grand Falls Little Colorado River
Grand Falls Little Colorado River

Here’s the release from the Environmental Protection Agency (Soledad Calvino/Rick Abasta):

The U.S. Environmental Protection Agency and the Navajo Nation EPA announced a pair of settlements with the Navajo Tribal Utility Authority to bring its wastewater treatment facility in Window Rock into compliance both with the federal Clean Water Act and the Navajo Nation Clean Water Act.

EPA’s agreement backs up a recent ground-breaking NNEPA settlement that required the NTUA to pay a $25,000 penalty. This is the first time that a tribally-owned entity has paid a penalty for violations of the Navajo Nation Clean Water Act. The NTUA has committed to bring the Window Rock facility into full compliance by December 31, 2015, or face additional penalties. NTUA has also agreed to build new infrastructure for the treatment plant at the site.

“For over 35 years we have partnered with the Navajo Nation to protect public health and the environment,” said Jared Blumenfeld, EPA’s Regional Administrator for the Pacific Southwest. “EPA applauds the Navajo Nation EPA for its leadership in setting this precedent that protects the Nation’s precious water resources.”

“The Navajo Nation Clean Water Act was created to protect the public health and the environment. These laws must be complied with by everyone within the Navajo Nation,” said Dr. Donald Benn, Executive Director of NNEPA. “The Window Rock Facility was out of compliance for a long time, prompting NNEPA’s Water Quality program to initiate an enforcement action. The parties have reached an agreement and Navajo EPA appreciates the cooperation by NTUA to implement a long term goal for compliance.”

An EPA inspection revealed that since at least 2011 NTUA had been discharging pollutants above its permit limits to Black Creek, a tributary of the Puerco River that feeds into the Little Colorado River. Other violations of the NTUA’s National Pollutant Discharge Elimination System permit included its failure to submit complete and timely reports while inadequately operating and maintaining its existing treatment system. The plant collects and treats sanitary sewage from a population of about 13,300 in Apache County, Ariz., within the boundaries of the Navajo Nation.

The settlements require the NTUA to conduct sampling, submit quarterly reports, train and certify the plant’s operators, and hold regular compliance meetings with senior officials of EPA and NNEPA. The NTUA will also submit a plan for EPA and NNEPA’s approval for the construction of an entirely new treatment plant including a detailed schedule for commissioning and bringing the new facility on-line. Approximately $10 million in funding for the new facility was provided through the U.S. Department of Agriculture’s Rural Utilities Service Water and Waste Disposal Loans and Grants Program

For more information on EPA’s Clean Water Act NPDES program, please visit: http://water.epa.gov/polwaste/npdes/

For more information on EPA’s Region 9 Tribal Program, please visit: http://www.epa.gov/region9/tribal/

For more information on Navajo Nation EPA, please visit: http://navajonationepa.org/ or call the Administration Office for assistance at (928) 871-7692.

More Environmental Protection Agency coverage here

Sump pumps hooked directly to wastewater lines a headache in Colorado Springs

Colorado Springs circa 1910 via GhostDepot.com
Colorado Springs circa 1910 via GhostDepot.com

From The Colorado Springs Gazette (Ryan Maye Handy):

…some incorrectly installed sump pumps in the Pleasant Valley neighborhood, around Colorado Avenue and 31 Street, have caused Colorado Springs Utilities’ wastewater lines to overflow with groundwater.

Utilities crews have worked for the last two weeks to remove some water from overloaded wastewater systems before the contaminated water overflows manholes and rushes into the street, said Utilities spokesman Steve Berry.

Pumps hooked up directly to the wastewater system are a problem for Utilities and homeowners.

“The number one risk is really for the customer,” Berry said Tuesday. “If the sump pump is hooked up to the wastewater system … then the biggest threat is really to your home.”

If excess groundwater gets pushed into the wastewater system, it could backfire and send water back into a home or a neighboring home, Berry said…

Sump pumps are supposed to discharge excess groundwater outside a home, typically through a pipe that dumps into a yard. But, particularly in older neighborhoods such as Pleasant Valley, sometimes the pumps are connected directly to a home’s wastewater line, which connects to Utilities’ wastewater main.

Homeowners own their wastewater lines and are responsible for maintaining them, and if damage on the private line affects the main Utilities line, homeowners could be liable, Berry said. He said homeowners should make sure pumps are correctly installed, although most will likely have to hire someone to check the system.

“These folks don’t even know, and it’s certainly not their fault, but now they need to,” Berry said.

More wastewater coverage here.

Colorado’s Water Plan and WISE water infrastructure — The Denver Post

WISE System Map September 11, 2014
WISE System Map September 11, 2014

From The Denver Post (James Eklund/Eric Hecox):

The Water Infrastructure and Supply Efficiency (WISE) project is a partnership among Aurora Water, Denver Water and the South Metro Water Supply Authority to combine available water supplies and system capacities to create a sustainable new water supply. Aurora and Denver will provide fully treated water to South Metro Water on a permanent basis. WISE also will enable Denver Water to access its supplies during periods when it needs to.

All of this will be accomplished while allowing Aurora to continue to meet its customers’ current and future needs.

Aurora’s Prairie Waters system will provide the backbone for delivering water from the South Platte when Aurora and Denver Water have available water supplies and capacity. The water will be distributed to the South Metro Denver communities through an existing pipeline shared with Denver and East Cherry Creek Valley Water and Sanitation District, and new infrastructure that will be constructed over the next 16 months…

WISE is a key element to this plan. With construction agreements in place, we will break ground in coming weeks to begin connecting water systems throughout the Denver Metro area. When WISE begins delivering water in 2016:

• The South Denver Metro area will receive a significant new renewable water supply;

• Denver will receive a new backup water supply;

• Aurora will receive funding from partners to help offset its Prairie Waters Project costs and stabilize water rates; and

• The Western Slope will receive new funding, managed by the River District, for water supply, watershed and water quality projects.

More WISE Project coverage here.

Fountain Creek District meeting recap

Fountain Creek Watershed
Fountain Creek Watershed

From The Pueblo Chieftain (Chris Woodka):

A debate over water quality on Fountain Creek in Pueblo County bubbled over into last week’s meeting of a district formed to improve Fountain Creek.

Pueblo Wastewater Director Gene Michael told the Fountain Creek Watershed Flood Control and Greenway District that studies by the city show no clear link between increased development and increased amounts of selenium in the water supply.

He said information from some city studies was misinterpreted at a recent function of the Arkansas River Basin Water Forum and he wanted to clear the air for the Fountain Creek district.

“There’s no way to measure what the selenium was 100 years ago,” Michael said. He explained there simply was no technology to measure parts per billion at the time. “The levels in 1981, when it was first measured, were higher than today.”

Selenium is known to accumulate in the Pueblo area because of water flowing over the Pierre shale formations.

The arguments are crucial to a case Pueblo is trying to make with the Colorado Water Quality Control Commission that it should have a specific discharge variance. An April hearing on the issue was postponed.

Pueblo maintains that it removes some selenium from groundwater intercepted in its treatment plant under a temporary modification. The ambient concentration of selenium in Fountain Creek and the Arkansas River near Pueblo is more than three times the EPA’s numeric standard, 4.6 parts per billion, he said.

The discussion touched a political nerve with the Pueblo city and county representatives on the Fountain Creek board.

“This is an interesting discussion to have with the Water Quality Commission,” said County Commissioner Terry Hart. The commissioners have supported a numeric standard on Fountain Creek, largely because of dealings with Colorado Springs Utilities for increased releases related to the Southern Delivery System. “My feeling is that we study it, find out where it is coming from and take it out.”

“It’s important to discuss it,” said City Councilman Dennis Flores, who invited Michael to speak at Friday’s meeting. He noted that the Pueblo Area Council of Governments supported the city of Pueblo 9-2, with two county commissioners in opposition. “I feel strongly about this and think it’s important.”

More Fountain Creek watershed coverage here.

Greeley pursues $8 million bond project for sewer system improvements — The Greeley Tribune

sewerusa

From The Greeley Tribune (Trenton Sperry):

At its regular meeting this week, the council introduced an ordinance allowing the city to sell $7.5 million in bonds in May. The bond revenues would be used to fund improvements to the city’s sewer system, marking Greeley’s first issuance of sewer debt since 1994.

Greeley’s annual debt payments — estimated at $550,000 for the next 20 years — would be funded by current sewer user fees, according to the ordinance.

Victoria Runkle, Greeley’s finance director and assistant city manager, said rate increases for Greeley’s sewer customers may be on the horizon, but they would adhere to the city’s current rate schedule, which raises rates by about 2 percent to 3 percent each year.

“We assume we will have to raise rates over time,” Runkle said. “Will that actually come to pass? That will depend on if revenues continue as they are. There have been years when we didn’t raise rates.”

In a draft of the bond project’s official statement, the city claims Greeley’s single-family residential customers paid less for sewer services than 17 of 24 Front Range municipalities surveyed in fall 2014. However, the city will be required to raise rates, fees or charges to balance debt payments as needed.

The bonds are being considered to help Greeley make needed upgrades to the sewer system more quickly, Runkle said.

“We’re not earning enough interest on the money we have in cash funds,” she said. “Interest rates are very low. We’re only able to make about 2 percent on cash reserves, but construction costs are up to 4 or 5 percent.”

Portions of Greeley’s sewer system date to 1889, according to the ordinance, and about 4 percent of the current system is more than 100 years old.

More infrastructure coverage here.

La Junta sewer rates to increase January 1, 2016

sewerusa

From the La Junta Tribune-Democrat (Candi Hill):

The La Junta Utilities Board approved a resolution Tuesday that sets new sewer rates for La Junta customers. The rates go into effect Jan. 1, 2016.

The per-month rates are as follows:

Residential Rates — $42.37

Residential West Side Rates (all residential units used as commercial rentals) – $64
Commercial/Municipal/Industrial/Large Customer Rates (all non-residential customers) – $59.21 … unless adjusted. For current commercial users, the adjusted charge shall be computed using the 12-month average water consumption from January through December of the prior year. Commercial accounts will be adjusted annually. A new commercial or industrial account shall be charged a sewer rate of $120 until the annual rate can be established using three months’ usage.

The commercial, municipal, industrial and large customer sewer rate is calculated as follows – Over 7,000 gallons: $3.50/1,000 gallons

Commercial West Side Rates – $89

The commercial West Side Sewer rate is calculated as follows – Over 7,000 gallons: $5.20/1,000 gallons
The minimum rate regardless of water use of residential, multi-dwelling, mobile home and commercial units will be $42.37 per month beginning Jan. 1, 2016.

The rate increase ties in with the city’s process of obtaining a loan to improve the city’s wastewater facilities. City Attorney Phil Malouff said the people who are going to purchase the bonds for the up to $14.2 million loan want to know there’s a minimum amount of revenue coming in from customers. These rates will establish that minimum amount of cash flow. The city has an obligation under the loan agreement and the bond, according to a resolution authorizing City Council to approve the loan, to constitute a revenue obligation of the city payable solely from the pledged property of the wastewater enterprise fund and will not create a debt or indebtedness of the city.

More infrastructure coverage here.

Mosca wastewater project progressing — the Valley Courier

Wastewater Treatment Process
Wastewater Treatment Process

From the Valley Courier (Phil Ray Jack):

Alamosa County Commissioners (ACC) received an update on the Mosca Wastewater Infrastructure Improvement Project Wednesday.

“The project is moving forward,” Rachel Baird reported , “and we are in the process of applying for the additional funding it will take to complete it.”

In January, the commissioners approved a $1.4 million plan for a new wastewater treatment system in Mosca. For years now, the small community located in northern Alamosa County has wrestled with a failing sewage system and the threats to public health caused by it.

According to some reports , the system has been in disarray for two nearly two decades, threatening residents’ health because the sewage is not being adequately treated before being discharged, and leaching into the area surrounding existing septic tanks. Seven of the 10 septic/leach fields systems have wells located within the minimum 100 foot setback distance, which makes them highly susceptible to contamination.

A preliminary engineering report describing the proposed system had been presented to the county during a previous meeting. Mosca’s new wastewater system will consist of three parts: a collection system, a wastewater treatment facility and a discharge system.

Ken Van Iwarden, who is representing Alamosa County in the process, explained that groundwater tests were conducted on March 17 by the Colorado Water Association. The results will not be known but will provide more information that will help with determining what type of system will be appropriate for the project.

Until the project is completed , the county will continue to regularly pump the failing system because there is no other option, costing county taxpayers upwards of $50,000 annually.

More wastewater coverage here.

@USGS: Certain wastewater management techniques can lead to more mercury in groundwater

9th Annual Grand Junction Water and Wastewater Conference, August 13 and 14, 2015

Grand Junction back in the day
Grand Junction back in the day

Save the Date!

August 13 and 14, 2015, are the dates for the 9th Annual Grand Junction Water and Wastewater Conference at the Two Rivers Convention Center, 159 Main Street, Grand Junction, CO. The Conference is designed to provide water and wastewater industry personnel with current information and training to address relevant issues in these industries.

Topics will include Water and Wastewater Treatment, Collection and Distribution Systems, Operations and Maintenance, Operator Math, Laboratory Practices, Safety Emerging Trends and Technologies. TU’s will be awarded.

Link: http://events.egov.com/eventreg/CO/event.htm?name=9thannualgrandjunctionwaterandwastewaterconference

More water treatment coverage here. More wastewater coverage here.

Pueblo County is caught between enforcing water quality upstream and supporting a variance for the City of Pueblo

Fountain Creek Watershed
Fountain Creek Watershed

From The Pueblo Chieftain (Chris Woodka):

Pueblo city and county officials are at odds over water quality regulations that could add millions of dollars to city sewer expenses.

The rift was great enough that the Pueblo Area Council of Governments backed down from a vote Thursday to support a variance for selenium and sulfates the city is seeking from the Colorado Water Quality Control Commission.

PACOG delayed its vote one month, after putting it off in December as well, in order to allow Pueblo County Commissioner Terry Hart to participate in debate.

Hart, along with Commissioners Sal Pace and Liane “Buffie” McFadyen, raised concerns that the county’s ability to insist on standards from upstream communities in El Paso County under the 1041 permit for Southern Delivery System would be compromised if they agreed to support a variance for Pueblo.

“Commissioner Hart is not here, and he wants to have a say,” McFadyen said. “In our future, we will have water quality issues in this county and we need to be consistent.”

That means the city will have to go into a state pre-hearing on Feb. 4 without support from other local governments. The variance itself will be considered by the state in April.

Pueblo City Manager Sam Azad said sewer fees could double or triple if the city is forced to meet numeric standards.

The reach of the Arkansas River below the Pueblo wastewater treatment plant has naturally high levels of selenium and sulfates. If numeric standards are enforced, no additional releases would be allowed.

Pueblo would have to pay up to $92 million and $9 million annually to seal its wastewater lines from collecting groundwater and to treat water released from the plant to remove all traces of contaminants, said Wastewater Director Gene Michael.

Sealing the lines from collecting groundwater, $35 million of the total, would actually increase selenium because existing treatment removes some of it from water that’s released. The disposal of waste from reverse-osmosis treatment would compound environmental damage, Michael said.

“Let me be crystal clear, the county is not in favor of spending $92 million,” Pace said.

One of the conditions of the delay was to give environmental attorneys John Barth of the county and Gabe Racz of the city time to work out a way to gain county support for the resolution without jeopardizing future SDS deliberations.

While Pace said that agreement was close, the city disagreed.

“It’s unlikely John Barth and the city would agree to anything,” said Dan Kogovsek, city attorney.

After an hour of discussion, City Council President Steve Nawrocki agreed to back off a vote until the February meeting in hopes of getting unanimous support from PACOG before the April state rule-making hearing. Pace and McFadyen promised the vote would not be delayed again.

More water pollution coverage here. More Fountain Creek watershed coverage here. More wastewater coverage here. More stormwater coverage here. More Southern Delivery System coverage here.

Bureau of Reclamation Releases Funding Opportunity for Title XVI Water Reclamation and Reuse Feasibility Studies

The Denver Water recycling facility
The Denver Water recycling facility

Here’s the release from the Bureau of Reclamation (Peter Soeth):

The Bureau of Reclamation is providing a funding opportunity for communities in the West which may be seeking new sources of water supplies using water recycling and reuse technologies. Funding made available will assist communities in determining whether water recycling and reuse projects are feasible. This funding opportunity is part of the Department of the Interior’s WaterSMART initiative, which focuses on improving water conservation, sustainability and helping water resource managers make sound decisions about water use.
The Title XVI Water Reclamation and Reuse Feasibility Study Funding Opportunity Announcement is available at http://www.grants.gov by searching for funding opportunity number R15AS00015. It is estimated that $1.3 million may be awarded this year.

Funding will be available in two funding groups. In the first funding group, up to $150,000 in federal funds will be available for smaller feasibility studies which can be completed in 18 months. For the second funding group – including larger feasibility studies which can be completed in 36 months – up to $450,000 in federal funds will be available. It is expected that most of the awards will be made in the first category. Feasibility studies are funded jointly by Reclamation and project sponsors. A cost-share of at least 50-percent of study costs is required.

The studies focus on examining municipal water reclamation and reuse, industrial domestic or agricultural wastewater, and naturally impaired groundwater and/or surface waters. Reclaimed water can be used for a variety of purposes such as environmental restoration, fish and wildlife and groundwater recharge, including municipal, domestic, industrial, agricultural, power generation or recreational use. Water reclamation and reuse is an essential tool in stretching the limited water supplies in the West. Since 1992, approximately $600 million in federal funding through the WaterSMART Title XVI Program has been leveraged with non-federal funding to implement more than $3 billion in water reuse improvements.

Funding applications are due on March 3, 2015, at 4:00 p.m. Mountain Standard Time. To learn more about the Title XVI Program, please visit http://www.usbr.gov/WaterSMART/title.

State provides $9.5 million for small community wastewater and drinking water system improvements

Here’s the release from the Colorado Department of Health and Environment (Mark Salley):

Fifteen community drinking water and wastewater systems in small communities throughout Colorado will receive a total of $9.5 million to fund planning, design or construction of public water systems or treatment works necessary for the protection of public health and water quality.

Funding for the grants was provided by the state Legislature under Senate Bill 09-165 and SB14-025. Governmental agencies, nonprofit public water systems and counties representing unincorporated areas of fewer than 5,000 people were eligible to apply for grants of up to $950,000.

cdphewastewaterpotablewaterprojects012015

This list is subject to change based on contract negotiations. In the event a recipient cannot accept the grant in whole or part, the available funds will be distributed per the request for application and the small community grant program rules, Regulation No. 55.

From The Colorado Springs Gazette (Jakob Rodgers):

Four projects in Teller County intended to improve water quality and wastewater treatment have received a hefty financial boost from oil and gas tax revenues. Colorado water officials recently awarded $9.5 million for 15 grants to small communities across the state – nearly $2.7 million of which will be spent in Teller County.

The money will go toward a mix of projects, including upgrades that could increase water capacity for one subdivision, and improvements that could assuage water quality concerns by some state regulators.

The state fielded 80 applications, making the grants very competitive.

“It was a very popular program this year,” said Tawnya Reitz, a project manager for the Colorado Water Quality Control Division’s grants and loans unit.

Tranquil Acres Water Supply, which serves a subdivision near Woodland Park, received $791,198 to upgrade its 1950s-era water infrastructure. It plans to re-drill wells, install new pumps and build a 100,000-gallon storage tank that could help alleviate water capacity issues, Reitz said.

The state awarded $498,870 to help finance water treatment upgrades so the City of Cripple Creek can meet new chlorine residual standards, she said.

The Florissant Water and Sanitation District received two grants, one for a drinking water project and another to better treat wastewater.

A $200,000 grant will help pay for the installation of a new filtration system, Reitz said.

A $950,000 grant is expected to partially finance new pond liners and a sequencing batch reactor for wastewater treatment, she said.

More water treatment coverage here. More wastewater coverage here.

Salida’s treatment facility wins award — The Mountain Mail

Salida Colorado early 1900s
Salida Colorado early 1900s

From The Mountain Mail (Ryan Summerlin):

The Salida Wastewater Treatment Facility was recently recognized in an article by Treatment Plant Operator magazine for winning the 2013 Wastewater Treatment Facility of the Year award.

TPO magazine is the industry’s go-to publication, said Randy Sack, wastewater plant manager.

“We were given this award because Salida was proactive on staying up to date with EPA (Environmental Protection Agency) and Colorado Department of Public Health and Environment mandates for effluent water quality,” said Dan Poole, a plant operator at the facility.

“And our success is largely due to the level of experience of our crew,” said Sack.

Sack is going on 37 years of wastewater treatment experience in Salida. The three employees under him have 30 years, 20 years and 5 years experience.

“We do the maintenance, run the lab, do the reporting – we even take turns doing the lawn outside,” Sack said.

“We’ve also been without a lost-time accident over the last 13 to 14 years. And we work in a very dangerous environment with poisonous gases and acids.”

The facility has also recently implemented a new treatment process called IFAS (integrated fixed-film activated sludge), which creates an environment for microorganisms that break down the waste.

The facility saw instant improvements when it implemented the new system, Sack said.

Before, the plant had been using a “trickling filter” system, which consisted of large tanks with rocks lining the floor where the microorganisms lived. With the new system thousands, if not millions, of half-dollar-size discs containing the microorganisms float in the wastewater and consume the waste before the water flows to the facility’s next compartments.

“With this new process, we were also able to get away from using chlorine gas in our disinfectant stage during final treatment,” Poole said. “Now, we use ultraviolet light for disinfectant.”

The measure of the facility’s success is clean water flowing back into the Arkansas River, said Sack. His crew runs a variety of tests on the water in their lab, covering biochemical oxygen demand, total suspended solids, E. coli testing, pH levels, temperature, phosphorus levels and many other useful measures.

In addition, flathead minnows and ceriodaphnia, a species of water flea, are tested in the water to make sure they can survive in the effluence, Sack said.

“Unfortunately, you don’t achieve that success without some pretty high energy bills, but we’re working to cut those costs where we can,” he said.

More wastewater coverage here.

Sewage lagoons to be upgraded below ski resort — The Grand Junction Daily Sentinel

Wastewater Treatment Process
Wastewater Treatment Process

From The Grand Junction Daily Sentinel (Gary Harmon):

Work to upgrade two sewage treatment lagoons below Powderhorn Mountain Resort could begin soon with state officials monitoring the process closely. The Colorado Department of Public Health and Environment issued a notice of violation in September to Grand Mesa Metropolitan District No. 2 for concentrations of ammonia in the lagoons that exceeded the limits of the permit for the facility. There are no allegations that the district released polluted water into a nearby stream.

“We did receive the notice and we knew it was coming,” said Larry Beckner, attorney for the district.

The metro district began working about four months ago with Westwater Engineers in Grand Junction to upgrade the lagoons to meet current standards, Beckner said. The 1968 sewage-treatment system was to have been replaced by a new system to accommodate expected growth. That growth, however, hasn’t taken place. The treatment system, meanwhile, was to have been upgraded to meet standards that took effect in July 2010. The permit was administratively continued in 2012, Beckner said.

The current permit for the water-treatment system included a compliance schedule to meet ammonia concentration limits, said Megan Trubhee, spokeswoman for the Department of Public Health and Environment’s Water Quality Control Division.

“The metro district failed to complete those upgrades,” she said.

The district is completing an evaluation of the facility, Trubhee said.

Metropolitan districts are established under state statutes to finance community planning and infrastructure projects, including initial construction of streets and some utilities.

Treated water from the lagoons is discharged into nearby Big Beaver Creek, which runs through pasture and farmland below, Beckner said.

There has been no discussion about whether the health department would levy a fine in the case, Beckner said.

The health department’s primary focus is to work with ​the district to ensure that compliance with the discharge ​permit ​requirements ​and Colorado’s Water Quality Control Act​ is achieved in a timely manner​ and no evaluation of potential penalties had yet been made, Trubhee said.

Violations of the Water Quality Control Act can result in fines of up to $10,000 per day.

More wastewater coverage here.

Water reuse: “It’s not a question of ‘Can we do it?’ We can do it” — John Rehring #COWaterPlan

Reverse Osmosis Water Plant
Reverse Osmosis Water Plant

From The Denver Post (Bruce Finley):

Colorado water providers facing a shortfall…are turning to a long-ignored resource: wastewater.

They’re calculating that, if even the worst sewage could be cleaned to the point it is safe to drink — filtered through super-fine membranes or constructed wetlands, treated with chemicals, zapped with ultraviolet rays — then the state’s dwindling aquifers and rivers could be saved.

Colorado officials at work on the first statewide water plan to sustain population and industrial growth recognize reuse as an option.

“We need to go as far and as fast as we can on water-reuse projects,” Colorado Water Conservation Board director James Eklund said.

But there’s no statewide strategy to do this.

Other drought-prone states, led by Texas, are moving ahead on wastewater conversion to augment drinking-water supplies.

Several obstacles remain: huge costs of cleaning, legal obligations in Colorado to deliver water downstream, disposal of contaminants purged from wastewater, and safety.

Local water plans recently submitted by leaders in five of Colorado’s eight river basins all call for reuse, along with conservation and possibly capturing more snowmelt, to address the projected 2050 shortfall.

Front Range utilities will “push the practical limit” in reusing water, according to the plan for the South Platte River Basin, which includes metro Denver. The Arkansas River Basin plan relies on reuse “to the maximum potential.”

Western Slope authorities in the Gunnison, Yampa and Colorado river basins contend Front Range residents must reuse all available wastewater as a precondition before state officials consider new trans-mountain projects.

The emerging Colorado Water Plan, to be unveiled Dec. 10, remains a general guide, lacking details such as how much water is available. Nor does this 358-page draft plan specify how much of Colorado’s shortfall can be met by reuse.

Water industry leaders urge an aggressive approach. Colorado officials should determine how much water legally can be reused and analyze how this could boost supplies, WateReuse Association director Melissa Meeker said in a letter to the CWCB. Colorado’s strategy “should be crafted to encourage innovation and creativity in planning reuse projects.”

Cleaning up wastewater to the point it can be reused as drinking water long has been technically feasible. Water already is recycled widely in the sense that cities discharge effluent into rivers that becomes the water supply for downriver communities.

Cleaning systems

In 1968, utility operators in Windhoek, Namibia, a desert nation in Africa, began cleaning wastewater and pumping it into a drinking-water system serving 250,000 people.

Denver Water engineers in the 1980s pioneered a multiple-filter cleaning system at a federally funded demonstration plant. From 1985 to 1991, Denver Water used wastewater to produce 1 million gallons a day of drinking water, which proved to be as clean as drinking water delivered today.

Delegations of engineers from Europe and the Soviet Union visited.

“There was a sense we were ahead,” said Myron Nealey, a Denver Water engineer who worked on the project.

But utility leaders scrapped it, partly out of fear that customers would object to drinking water that a few hours earlier might have been flushed from a toilet. They also were struggling to dispose of thousands of gallons a day of purged contaminants — a super-concentrated salty mix that must be injected into deep wells or buried in landfills. [ed. emphasis mine]

So Denver Water has focused instead on recycling wastewater solely for irrigation, power-plant cooling towers and other nonpotable use. An expanding citywide network of separate pipelines distributes this treated wastewater — 30 million gallons a day.

“Reuse is definitely a way to maximize the use of the water we have,” said Jim Lochhead, manager of Denver Water and former natural resources director for the state.

“We’re in the exploration stage of trying to analyze what are the options for various types of reuse,” Lochhead said. “What’s the most effective? What’s the least costly? What’s the most secure?”

Meanwhile, drought and population growth in Texas have spurred construction of water-cleaning plants at Wichita Falls and Big Spring. Engineers have installed water-quality monitoring and testing systems sensitive enough to track the widening array of pathogens, suspended particles and hard-to-remove speciality chemicals found in wastewater.

A Texas state water plan calls for increasing reuse of wastewater eightfold by 2060. The New Mexico town of Cloudcroft is shifting to reuse as a solution to water scarcity. And California cities hurt by and vulnerable to drought, including San Diego, are considering wastewater conversion for drinking water.

Costs can be huge, depending on the level of treatment. Water industry leaders estimate fully converted wastewater costs at least $10,000 per acre-foot (325,851 gallons).

By comparison, increased conservation, or using less water, is seen as the cheapest path to making more water available to prevent shortages. The most costly solution is building new dams, reservoirs and pipelines that siphon more water from rivers.

Colorado also faces legal constraints. The first-come-first-serve system of allocating water rights obligates residents who rely on diverted water from rivers to return that water, partially cleaned, to the rivers to satisfy rights of downriver residents and farmers.

However, much of the Colorado River Basin water diverted through trans-mountain pipelines has been deemed available for reuse. Western Resource Advocates experts estimate more than 280,000 acre-feet may be available. In addition, water pumped from underground aquifers — the savings account that south Denver suburbs have been tapping for decades — is available for reuse.

Indirect reuse

While nobody in Colorado has embarked on direct reuse of treated wastewater, Aurora and other cities have begun a form of indirect reuse that involves filtering partially treated wastewater through river banks. This water then is treated again at Aurora’s state-of-the-art plant. Cleaned wastewater then is blended with water from rivers to augment municipal supplies.

The most delicate challenge has been dealing with safety — making sure engineered water-cleaning systems are good enough to replace nature’s slow-but-sure settling and filtration.

While industry marketers focus on semantics to try to make people feel more comfortable — rejecting phrases such as “toilet to tap” to describe reuse — engineers are honing the systems.

They envision early-detection and shut-off mechanisms that quickly could stop contaminants left in water from reaching people. They aim for filtration and other advanced treatment sufficient to remove the multiplying new contaminants found in urban wastewater. Cleaning water increasingly entails removal of plastic beads used in personal-care products; mutating viruses; resistent bacteria; synthetic chemicals such as herbicides; ibuprofen; birth control; anti-depressants; and caffeine.

“That’s the whole job of treatment and monitoring, to remove pathogens and other contaminants to where it is safe to drink,” said John Rehring of Carollo Engineers, a Denver-based expert on water reuse.

“It’s not a question of ‘Can we do it?’ We can do it,” he said. “And because of growing affordability and public acceptance, we’re starting to see it implemented.”

San Juan Basin: “Compliance with [federal salinity discharge standards] is impossible” — Ron Rosen

Wastewater Treatment Process
Wastewater Treatment Process

From the Farmington Daily Times (Dan Schwartz):

A city contractor says Farmington is seeking an exemption from a federal law regulating San Juan River salinity levels.

Compliance with the law — which the city is violating — is impossible, said Ron Rosen, project director for CH2M Hill, an agency contracted to operate the city’s water and sewage treatment plants.

“We’ve been really aggressive. We’ve done everything (the Environmental Protection Agency has) told us to do,” Rosen said.

The main cause of the pollution, he said, is domestic water softeners. They discharge salt into the city’s sewer system, which the Wastewater Treatment Plant then discharges into the San Juan River.

The city is currently testing whether softening water at its treatment plants could reduce its drinking water’s hardness, allowing residents to shut off their water softeners.

In 2005, the EPA began regulating the levels of salt that industries and cities discharge into the Colorado River Basin. The largest river in the basin, the Colorado River, winds about 1,400 miles from the Rocky Mountains to the Gulf of California. The San Juan River is one of its major tributaries.

The regulations date back to the 1944 Mexican Water Treaty and were amended many times before they became law in 1974, when Congress enacted the Colorado River Basin Salinity Control Act.

Now, for Farmington to consistently comply with the law, it would have to spend $60 million to $70 million — an engineering firm’s estimate — and the city can’t afford to do that, Rosen said. The EPA could fine the city $27,500 a day for the violation, but it hasn’t yet, he said.

More San Juan Basin coverage here.

CDPHE extends Durango’s wastewater treatment compliance deadline by 6 years

Durango
Durango

From The Durango Herald (Mary Shinn):

While all the estimated $55 million upgrades will have to be made, the state health department agreed to extend the city’s deadline until 2023, City Manager Ron LeBlanc announced Tuesday night.

As a result, the city will be able to rethink its steep 2015 sewer-rate increases. City Council had been told the plant would need 80 percent more revenue in 2015 to fund all the needed projects and to finance a bond issue.

“The pressure to rush to an 80 percent increase has now been alleviated,” LeBlanc said.

Under the law, if the wastewater-treatment plant did not meet all the new regulations by December 2017, the plant would face consent order. Under this order, the city would not be allowed to issue more sewer taps and could face hefty fines.

Under the extension, the city will have to adhere to a schedule to come into compliance and limit the amount of phosphorous and nitrogen in the water. These two chemicals need to be reduced to curb imbalances in the environment.

Also, the city now will have more time to consider potentially relocating the plant further south away from town or another location. Councilor Christina Rinderle has been encouraging her peers to consider this alternative.

“It’s an opportunity to really think through these major investments,” LeBlanc said.

More wastewater coverage here.

Durango faces possible $55 million in wastewater plant upgrades

Wastewater Treatment Process
Wastewater Treatment Process

From The Durango Herald (Mary Shinn):

In addition to the staggering estimate, the construction must be completed by December 2017 to meet state regulations for higher water quality.

Currently, the plant is releasing more nitrogen and phosphorous into the Animas River than the new regulations allow.

If the plant does not meet the new rules, it could be placed under a consent order by the state and will not be allowed to build any more sewer taps. This would halt any city growth. It could also equate to a $25,000 daily fine, said Utilities Director Steve Salka.

The regulations were approved in 2012 because high levels of nitrogen and phosphorous causes algae to bloom faster than ecosystems can handle. Too much algae deprives fish and other aquatic life of oxygen, said Meghan Trubee, community relations liaison for the Colorado Water Quality Control Division.

“We’re affecting the base of the food cycle in the wild,” said John Sandhaus, wastewater treatment plant superintendent for the city of Durango.

To remove what is effectively too much fertilizer, the sewer plant will need greater capacity and new technology, he said.

The upgrades should make the plant quieter and reduce the sickening smell that occasionally wafts across Santa Rita Park.

“If this plant is built the way we suggest it be built, you won’t even know it’s here,” Salka said.

Designs include 11 new structures, including a new administration building that may be built near the park to distance the public from the process, Salka said.

The capacity of the plant also will be increased from 3 millions gallons of water per day to 4 million, so it would be prepared for growth.

The new structures will add more equipment to almost every step of the treatment process.

When raw sewage enters the plant, it flows into a headworks building where the current flow-measurement device is too small to handle peak times. It also violates state standards because it cannot be cleaned or calibrated because it is underneath the concrete floor, Sandhaus said.

Once inorganic matter is removed, the waste flows into stilling basins, called primary clarifiers. Here, solid waste is separated from the liquid waste. These would not be replaced, but they would be covered with domes to filter the air.

The water then flows into an aeration basin where micro-organisms digest the waste in the water.

“We call ourselves bug farmers,” Sandhaus joked, while looking out across the dark-brown bubbling basins.

Four new aeration basins must be built with about five times the capacity of the existing basins, Sandhaus said.

Management also plans to replace the blowers that pump air into the basins from direct current to alternating current for efficiency, Salka said.

Solids are then removed from the water again in secondary basins, and the plant will need two more of these basins.

The water is then sterilized with ultraviolet light. A secondary sterilizer will be part of the upgrades because the plant is violating state regulations without one.

Sludge is processed separately from water in a digester. Much as the name suggests, here micro-organisms feed on the waste. The upgrades call for another digester that will prevent the stench currently caused by cleaning and maintenance.

Under the plan, processed waste will be dried in another new building. Here, human waste will be turned into dry pellets that can be sold as fertilizer.

Currently, the plant produces four to five tanker truck loads a day of mostly water mixed with 2.5 percent processed human waste. The plant pays $250,000 a year to truck this waste away.

The preliminary designs also call for a station where restaurants could send grease instead of pouring it down a drain. This can be used to increase the production of methane and produce more electricity.

All of these improvements would be scheduled, so that the plant can continue processing waste during construction. April 2016 is the earliest that construction may start.

More wastewater coverage here.

Cortez Sanitation District gives some businesses a break on rates

Cortez early 1900s via Crow Canyon Archaeological Center
Cortez early 1900s via Crow Canyon Archaeological Center

From the Cortez Journal (Tobie Baker):

The Cortez Sanitation District will provide temporary relief to dozens of local businesses that saw sewer rates spike 100 percent or more this year…

The CSD resolution states it is “fair, equitable and in the public interest to limit any rate increase to 100 percent in any one calendar year.” Teresa Wlodyka, owner of the Tomahawk Lodge on South Broadway, is among 54 customers to be impacted by the resolution. Rate changes should be reflected in September bills…

CSD manager Tim Krebs said the adjusted rates could remain in effect for 12 months.

“The board can adjust rates at any time,” said Krebs. “We just wanted to give some relief to those who were affected above 100 percent.”

The resolution also states “rates being adjusted down are subject to up to another 100 percent per calendar year until their rates meet the current SFE schedule.” Krebs said that if a customer’s previous bill, for example, was $100 per month, the stipulation allows the board to increase the bill to $200 per month next year and even up to $400 per month the following year.

“The rates need to eventually meet the same rate schedule everyone else is being billed from,” said Krebs.

Approved by a 3-1 margin, the resolution is forecast to cost the district $68,589, but save business owners $56,628 and public entities $11,961. Board member John Stramel voted against the measure. Board member John Candelaria was absent from the public hearing.

More infrastructure coverage here.

Donala merges wastewater operations with Academy — Tri-Lakes Tribune

Wastewater Treatment Process
Wastewater Treatment Process

From the Tri-Lakes Tribune (Danny Summers):

It may not by the biggest wastewater merger in Colorado history, but Donala Water and Sanitation grew by more than 10 percent when the Academy Water and Sanitation District Board approved a resolution to connect its wastewater operations with Donala.

“Academy made the decision between Colorado Springs Utilities and us,” said Donala general manager Kip Peterson. “It makes sense for both Academy and us from a cost perspective.”

Academy, which has about 300 customers, managed its own wastewater treatment for nearly five decades. Donala has about 2,800 customers and has shown steady growth through difficult economic times in recent years.

“We’ve been talking with Academy about this merger for the last decade,” Peterson said. “We had a wastewater treatment plant already designed with that thought in mind.”

Peterson said that pipes will be laid from Academy’s lagoon on Spring Valley Drive to Donala’s collection pipes. From there, a lift station will pump Academy’s wastewater to the Donala pipes for treatment by the Upper Monument Creek Regional Wastewater Treatment Facility.

Peterson said the process will take some time and probably will not begin take place until the fall 2018, as required by Academy’s wastewater permit.

Academy’s Board was forced to make a change months ago because of new state regulations that could not be met by the district’s current lagoon treatment system. It looked at building a new plant at its current location, but the Board found that option to be much too costly.

Meanwhile, Donala’s General Manager explains why rate continue to increase in this report from Danny Summers writing for the Tri-Lakes Tribune. Here’s an excerpt:

One of Kip Peterson’s main goals as general manager of Donala Water and Sanitation is to keep an open-door policy to the folks in his District.

One of the main questions most residents want to know is why do their water rates continue to go up and why are they restricted on their outside watering?

“That is a big concern for a lot of people,” Peterson said. “And I completely understand why.”

Earlier this month, Peterson and his staff included in its newsletter to its customers a rare comparison with some local water companies. The list included Donala, Woodmoor, Woodmen Hills, Colorado Springs, Monument and Triview.

“I put it out there so folks can see for themselves, Peterson said. “I have a very strong belief that we have to remain transparent.”

Donala customers have been on water restrictions for eight years. Colorado Springs Utilities customers were on water restrictions in 2013, but that was lifted this year.

“I think that was a mistake,” Petersons said. “I think that sends a bad message to the community. Do you really want to conserve water or do you want to make money?

“(Donala’s) rate structure is intentionally designed for conservation.”

More wastewater coverage here.

AWRA Colorado Section: Wastewater as a New Supply, webinar August 20

Weld County earthquake: “Just drill new wells and increase recycling” — Ken Carlson

Deep injection well
Deep injection well

From The Greeley Tribune (Sharon Dunn):

The answer to Greeley’s first earthquake in at least 40 years may be sitting 10,000 feet below the surface in a deep-water trash can that might be overfilling.

The oil and gas boom has put added stress on the industry’s resources, more specifically in deep wastewater injection wells that cut two miles below the surface. But some say the answer may be as simple as water management.

Wastewater injection wells — which take in produced water from fracking jobs — may now go under increasing scrutiny in Colorado, as scientists have found strong connections between them and a spate of small earthquakes across the country in recent years.

Still, most injection wells are not linked to any earthquakes; it’s only a tiny fraction of injection wells that have specifically been cited as the cause of a minor quake. It’s a puzzle that continues to grow for seismologists looking for answers.

Researchers from the University of Colorado at Boulder put out seismographic equipment throughout Weld County last week, hoping to cull the earth’s secrets into a database of answers. If injection wells are found to be the common denominator in further quake activity, they’ll capture it.

But in the absence of answers, some would say solutions are not that difficult.

“There are ways to fix this,” said Ken Carlson, an associate professor of civil and environmental engineering at Colorado State University. “This is sort of a byproduct of too much water being disposed of, but it’s not like we should shut it down. That’s what the activists will say. It just means we need to improve our water management. So if you say this is probably related to disposal wells, it isn’t that hard to change our practices and really fix this. Just drill new wells and increase recycling.”

WHAT ARE INJECTION WELLS

Injection wells have long been handy tools for oil and gas companies to dispose of wastewater in an environmentally friendly way. The water is pumped two miles beneath the surface into porous rock, through which the water disperses — allowing more water to be pumped in. The process is highly regulated by the Environmental Protection Agency and state oil and gas regulators. Operators must adhere to disposing of water at tested rates and volumes, so as not to overwhelm the well, and they are subjected to annual inspection and well integrity testing every five years, state officials say.

“In a natural system like that, you can do projections. But until you push it to the limit, you can’t really prove it,” Carlson said, noting that he was clearly guessing. “Maybe it’s never been pushed that high.”

For Anadarko Petroleum Corp., which is working to manage its water resources by using municipal effluents, recycling and piping water into sites rather than trucking, officials say they may be coming close to a “limit” on its injections wells, and have been working toward better management to dispose of less.

“The wells are definitely a cause of concern with induced seismicity,” said Korby Bracken, environmental health and safety manager for Anadarko. “We think they’ll continue to be used but it’s something we’re studying quite a bit. There have been multiple studies in Ohio and Oklahoma and other areas where the injection of produced water from oil and gas had the potential to cause induced seismicity. It’s definitely something we’re taking a look at.”

The puzzling part to seismologists is that some areas rife with injection wells for years have no earthquake activity; still others start quaking the minute the well is drilled. There were two injection wells in proximity to the perceived epicenter of the Greeley quake — one was two years old, and the other was 20.

“There are a lot of variables,” said Justin Rubinstein, a seismologist out of Menlo Park, Calif., who is chief of the Induced Seismicity Project, which studies man-made earthquakes. “Maybe this earthquake relieved everything that was available to be relieved or maybe it didn’t and there will be more. Maybe the operator said I might be causing earthquakes, I need to stop injection or slow injections. Generally, when you slow or stop injections, earthquakes slow down.”

The idea of drilling more injection wells to relieve the pressure on existing wells is favored in the exploration community.

Carlson said the water could get dispersed a bit more evenly, reducing pressure with the oil and gas boom going on in Weld.

“It’s not a bucket,” Carlson explained of the rock in which the water is pumped. “It’s more like a sponge. You put the water in and it gets absorbed, then it diffuses through the formation. But you can’t just put in an unlimited rate and keep raising the pressure. Then something would give, and that something might be a fault. With the growth in fracking and unconventional oil and gas in the DJ, there’s certainly greater demand on some of these water disposal sites.”

Rubinstein said he wasn’t so sure drilling more injection wells is the answer.

“In a different perspective, now you’re covering more areas with injections wells, so maybe you’re increasing the probability of finding an area that has a fault,” Rubinstein said. “There are so many variables out there.”

Rubinstein suggested creating mid-volume wells, alleviating pressure that way. “But I don’t know if it gets you out of the problem,” he said.

Anadarko has a permit pending for an injection well. The company has three in Colorado now, all that are running at capacity.

“That being said, we’re looking at other and alternative ways to recycle the fluids that come from the well bore,” Bracken said. “So we don’t have to rely as much on those saltwater injection wells.”

Water, water everywhere

A typical frack job will use 3 million to 4 million gallons of water, but not all of it comes back once the rock is stimulated 7,000 feet below ground. Typically, about 20 percent of the water comes back to the surface during a frack job.

Companies will take that flowback, treat the water on site to take out harmful bacteria from beneath the ground, and truck or pipe it out for recycling or injection. The rest of the water comes out with the oil and gas over time.

Recent years have shown the technology is available to clean up used fracking water, enough to be reused, much like a municipal wastewater treatment system.

“Some operations are pushing ahead with more recycling,” Carlson said. “The more you recycle, the less you’re disposing of and that’s a good thing.”

Anadarko and Noble are big customers of High Sierra Water Services, which operates two recycling facilities in Weld County. Two of their facilities together can recycle about 20,000 barrels a day (840,000 gallons). Both companies have worked on both ends to recycle water.

Anadarko, for example, takes effluent from the city of Aurora’s wastewater treatment plant for most of its fracking operations, then reuses the water over and over.

“If you put down 10 units of something and only get two back, you have to make up eight units for the next well,” Bracken explained. “We’ll recycle what comes back, add make-up water, put it downhole, recycle what comes back and, eventually, you’re recycling the same molecule of water over and over again.”

Both companies are piping recycled water to and from recycling facilities.

But not all water can be recycled. Sometimes it’s too salty. That’s where injection is most necessary.

“Some of the water is very saline,” Rubinstein said. “Some of the water they’re producing in Oklahoma is … 15 percent salt. Salt is highly corrosive. They really can’t reuse it.”

Though reusing the water is the ideal, there’s simply not enough storage out there to hold the water.

“I guess I’d say there is the ability to now recycle probably 15 to 20 percent of the 100,000 barrels a day coming out of the DJ,” said Josh Patterson, operations director for High Sierra. A third recycling center is in the planning stages.

“Logistically speaking, there wouldn’t be a reservoir large enough to store every barrel (of wastewater) for it to be re-used,” Patterson said.

Costs of recycling are high, but so are trucking costs. If companies can eliminate trucking in new water, and recycle existing water, that takes trucks off the road and reduces those expenses.

Patterson said the demand for water recycling continues to grow, however, with both of High Sierra’s facilities contracted out for the next five years.

From the Associated Press via the Fort Collins Coloradoan:

The Greeley Tribune reported Friday that [geophysicist] Anne Sheehan and a team of graduate students have been deploying seismographs to study the magnitude 3.4 quake. The U.S. Geological Survey determined the epicenter of the quake was believed to be 5 miles beneath the surface about 4 miles northeast of Greeley.

The suspected epicenter is near two injection wells. The May 31 earthquake caused no damage.

“If we find out something useful about whether injection causes earthquakes, it might be something that the industry can use to do a better job of injecting, if that turns out to be a problem,” Sheehan said.

Weld County has 28 injection wells for oil and gas waste, or “Class II” disposal wells.

State drilling regulators said earlier this week they were skeptical that the wells caused the earthquake.

The epicenter is difficult to determine, said Justin Rubinstein, a seismologist in Menlo Park, California, who has studied the increasing phenomenon of man-induced earthquakes for the past three years.

More oil and gas coverage here.

Denver Water recycled water for the Rocky Mountain Arsenal? CDPHE says not so fast.

Rocky Mountain Arsenal -- 1947
Rocky Mountain Arsenal — 1947

From The Denver Post (Bruce Finley):

Even with Colorado’s push to rely more on recycled water, the Rocky Mountain Arsenal National Wildlife Refuge will spend another summer using millions of gallons of Denver’s drinking water to fill lakes and irrigate fields after a recent decision by state health officials.

Federal wildlife biologists calculate they’re drawing more than 82 million gallons of Denver drinking water a year to fill three once-toxic lakes at the refuge, formerly a nerve gas and pesticides plant that became an environmental disaster.

“This refuge needs water, and using recycled water to fulfill a portion of our needs is a wise choice for the future,” refuge manager Dave Lucas said. Denver recycled water “meets our needs and allows millions and millions of gallons of drinking water to be put to better use by Denver residents.”

But the Colorado Department of Public Health and Environment last week reaffirmed its position that the refuge must go through a process of proving why it should be allowed to use water that is not as clean and submit to an Environmental Protection Agency review.

A $2.1 billion cleanup of toxic pollution included restoration of the lakes for catch-and-release fishing and to store water, which wildlife managers use to irrigate the 27-square-mile refuge — habitat for bison and other species.

Until the drought of 2002, High Line Canal agricultural water trickled into the lakes. Groundwater pumping added more water. CDPHE at some point — it was not clear when — reclassified the lakes as water supplies, and refuge managers made a deal with Denver to use drinking water, which started in 2008.

Then, in 2009, CDPHE reclassified the lakes as water bodies, meaning “an important social or economic development” reason for allowing lesser-quality water must be demonstrated. State officials, on an emergency basis in May 2013, agreed to remove the water supply classification on the refuge lakes but still require the proof of a public purpose before water quality can be reduced.

Frustrated refuge managers, backed by Denver Water and the Denver Museum of Nature & Science, have been pressing to use recycled water and putting in the plumbing to do so.

Denver Water has spent more than $197 million installing a citywide 80-mile network of pipelines that distribute partially treated recycled water to parks, golf courses and the Denver Zoo. The museum uses recycled water in its new heating and cooling system.

All sides agree that using more recycled water is a priority.

But CDPHE Water Quality Control commissioners on May 13 voted 5-4 to reject a request to reconsider — so the refuge must go through a “necessity of degradation demonstration” review to be able to use recycled water.

“We want to support use of recycled water. But we cannot do it by bending the rules,” CDPHE water quality standards chief Sarah Johnson said. “The best solution is for them to complete the necessity of degradation determination. It isn’t a heavy lift. We have promised to help.”

U.S. Fish and Wildlife Service managers of the refuge say the analysis for the review would not cost much but would require spending $10,000 to $15,000 a year more for water monitoring. They said new analysis would have to be done every three to five years, tied to permitting, creating uncertainty because state officials could ask for operational and infrastructure changes during reviews.

Lucas said even if they were to have something to present by the June commissioners’ meeting, it would be October at the earliest for the water switch if everything was approved.

Denver Water officials have been working aggressively since 2004 to increase use of recycled water, saving 7,000 acre-feet of drinking water a year, utility recycled water director Jenny Murray said.

Switching to recycled water at the refuge is the correct solution, Murray said. “It’s the right use because we are trying to preserve drinking water supplies for a growing population in a water-scarce region. Using drinking water for uses that do not require drinking water is wasteful.”

Denver Water attorneys in a May 6 letter to CDPHE argue that state lawmakers have ordered efforts to “encourage the reuse of reclaimed domestic wastewater.” Denver Water contends CDPHE decisions undermine state policy, waste public resources and defy common sense by imposing a needless bureaucratic burden.

One of Denver’s new recycled water pipelines runs by the Denver Museum of Nature & Science to the refuge. A steady, year-round flow of recycled water in that pipeline is required to ensure sufficient flow to run the museum’s innovative new geothermal heating and cooling system, which was funded by a federal grant to boost energy efficiency.

“When we designed our system three to four years ago, both Denver Water and the refuge folks felt that obtaining a permit to discharge recycled water into the lakes at the refuge would not be a problem,” said Dave Noel, museum vice president for facilities, capital projects and sustainability.

CDPHE’s stance “has got all of us scratching our heads,” Noel said.

Museum officials sent a May 8 letter to CDPHE arguing that “the loss of 17,000 acres of thriving wildlife and fish habitat due to lack of water would be a severe blow to the state and the Front Range, and simply does not make sense when a logical solution seems readily available.”

At the refuge, future water needs are projected as high as 456 million gallons a year. Beyond Denver Water, wildlife managers rely heavily on pumping water from underground aquifers into the Mary, Ladora and Lower Derby lakes — pumping they are trying to reduce by using more recycled water, which is cheaper than drinking water. They calculate the federal water bill could be cut by $30,000 a year.

A thriving bison herd is growing, with 11 calves born this spring, pushing the population to 81. An adult bison can eat around 50 pounds of grass a day. A team of biologists recently had to reduce the herd to prevent exhaustion of the short-grass prairie. Plans call for expanding bison habitat to allow a herd of 209 bison, which would roam up to the road to Denver International Airport, where a visitor viewing station is envisioned. Not having reliable recycled water will limit the bison herd and lead to decreased numbers of waterfowl, fish and grassland birds, Lucas said.

“We’re probably not going to irrigate this summer, which is bad for habitat restoration,” he said, “or we will have to drain down the lakes to irrigate.”

Lucas remains puzzled by the entire process.

“We’re talking about the same recycled water used everywhere. But somehow the refuge is different? Lots of smart people are looking at this, and no one can figure it out,” he said. “We engaged in this year-long process with hopes of fixing their error — the water supply change. Why would we want to engage in another unknown and uncertain process that will last months, if not years?”

More South Platte River Basin coverage here.

Colorado Foundation for Water Education’s “Urban Waters Bike Tour” recap


It was a grand time the other day cycling along the South Platte and hearing about current projects, operations, hopes and plans.

The tour was from the Confluence of Clear Creek and the South Platte River to Confluence Park where Cherry Creek joins the river.

Along the way we heard about Clear Creek, water quality in the South Platte Basin, infrastructure investments, and education programs.

A recurring theme was the effort to reach out to a younger generation through the school system.

Darren Mollendor explained that the program he honchos attempts to get the students to connect to their neighborhood parks. This includes an understanding of pollution, pollution abatement, and habitat improvement. He invited us all to go camping at Cherry Creek Reservoir when students from the upper and lower Cherry Creek watershed get together later this summer.

Michael Bouchard (Denver Parks and Recreation) detailed planned improvements along the river through Denver. Most of the new facilities will also have an education focus, including native flora at some locations.

Metro Wastewater is one of the largest clean water utilities in the nation, according to Steve Rogowski. The Metro District is directing a huge investment to comply with tougher treatment standards.

At the Burlington Ditch diversion Gray Samenfink explained operations under the ditch. The ditch is a supply for Barr Lake, other reservoirs, and direct irrigators. Several municipalities also take water off the ditch. The new diversion and flood control structure replaced the old dam at the location.

Caitlin Coleman (Colorado Foundation for Water Education) was tasked with keeping the tour on track. That was no easy task. When you get young and older, students, water resources folks, educators, conservationists, scientists, attorneys, engineers, and ditch riders together there’s going to be a lot of stuff to talk about.

Click here to go to the CFWE website. Become a member while you are there. That way you’ll know about these cool events in advance so you won’t miss the fun.

More Colorado Foundation for Water Education coverage here.

Animas River: e.Coli is a culprit in water quality

E.coli Bacterium
E.coli Bacterium

From The Durango Herald (Dale Rodebaugh):

The main focus of the San Juan Watershed Group research is E. coli and nutrients – nitrogen and phosphorus. Certain strains of the former can cause nausea, fever and vomiting. The latter, in excess, robs water of oxygen needed by aquatic life.

The group tested only for E. coli last year. This year, nutrients were added. So far this year, the E. coli level has been well within limits at the New Mexico line, May said.

A Colorado partner, the Animas Watershed Partnership, which works on water-quality projects in New Mexico and with the Southern Ute Indian Tribe, also is following the work of May’s group, now in its second year, said Ann Oliver, coordinator of the Colorado project.

Oliver said her group is searching for funding for similar research at two points upstream – on the Animas upstream of the Florida River and on the Florida before it reaches the Animas, she said…

The hope is to get enough money to test for E. coli and nutrients at the Animas and Florida sites and pay for genetic testing at Bondad to determine the source of E. coli contamination, Oliver said. May’s volunteers measure the amount of E. coli and nutrients at the site here, but the organization can’t afford the cost of source analysis.

Last year, May’s volunteers sampled water once a week from April through October on the Animas at the state line (Bondad), Aztec and Farmington and on the San Juan River at Farmington and Hogback Canal, the point where the San Juan enters the Navajo Nation…

Laboratory tests can determine through DNA analysis if E. coli bacteria come from animals – and which animals – or from human sources. Tests last year in Colorado showed that E. coli met the state’s standards, indicating that contamination was originating downstream in New Mexico.

In fact, all 40 samples collected at Hogback Canal tested positive for human bacteria found in feces, the report said. Nearly all 40 samples from Farmington and 26 from Aztec tested positive for the human bacteria.

A story in the The Daily Times of Farmington quoted Mike Stark, the San Juan County operations officer, as saying that officials know that aging septic systems and illegal septic dumping are potential problems.

David Tomko, retired from the New Mexico Environment Department, now the San Juan Watershed Group coordinator, is cautious. Tests for human fecal matter in the Cimarron and Rio Grande rivers found no human waste, so conclusions about the Animas and San Juan readings require confirmation, he said.

The heavy metals leaching from shuttered hard-rock mines around Silverton present no problem at the state line because of dilution, Tomko said. The level of those metals never has exceeded the limit, he said.

Peter Butler, former chairman of the Colorado Water Quality Control Board and a coordinator of the group looking for a solution to the toxic waste draining from Silverton mines, said heavy metals are diluted enough to be below limits by the time the Animas River reaches Durango.

Even heavy-metal contributions from Lightner Creek don’t push Durango over the limit, Butler said.

May’s group also tests water for turbidity, pH, optical brighteners (detergent additives that brighten colors) and total dissolved solids.

On Monday, the Animas River water didn’t look as cloudy when May poured it from the dipper into sample bottles as it did flowing in the channel.

Last year at about the same time – the spring runoff – the Animas water registered 13.5 turbidity units, May said. During the later monsoon season, she found upward of 600 units.

Turbidity is measured by a nephelometer, an apparatus that records size and concentration of particles in a liquid by analyzing the refraction of light beamed into it.

More Animas River coverage here and here.

Denver, Aurora and Colorado Springs all utilize non-potable irrigation in city operations

Metropolitan Wastewater Reclamation District Hite plant outfall via South Platte Coalition for Urban River Evaluation
Metropolitan Wastewater Reclamation District Hite plant outfall via South Platte Coalition for Urban River Evaluation

From the Colorado Springs Business Journal (Marija B. Vader):

Colorado Springs Utilities, along with Denver Water and the city of Aurora, all reuse a significant amount of water after it has gone through a treatment plant. It’s called non-potable water and as such is not acceptable for public consumption, cooking or bathing.

The wastewater system collects all the water from homes and businesses, then treats it to conditions set by the state health department. In most treatment centers throughout the state, the treated, non-potable water is then released back to the river or source whence it came. In Colorado Springs, Denver and Aurora, that water is recaptured and reused to water golf courses, public parks, cemeteries and the like. The systems do not extend to residential uses.

“The cost is extremely prohibitive to build such a system,” said Steve Berry of CSU. “Most customers would not tolerate the rate impact.” A system would cost in the hundreds of millions of dollars, he added…

The non-potable system in Colorado Springs provides a capacity of 13 million gallons a day during the summer. The Colorado Springs system has 26 miles of distribution pipelines that stretch to Bear Creek Regional Park, Kissing Camels Golf Course, Patty Jewett Golf Course, the U.S. Olympic Training Center, Peak Vista Community Health Centers, El Paso County, Memorial Park, Evergreen Cemetery, Colorado College, Valley Hi Golf Course and others. This program was put together beginning in 1961. Utilities’ charge for non-potable water is significantly less than for treated water.

Aurora’s non-potable system is used to irrigate parks, said Greg Baker, manager of public relations for the Aurora Water Department.

“It’s 5 million gallons a day we can save from potable use,” Baker said. The city’s irrigation season stretches from May 1 through Oct. 30.

“It makes perfect sense,” Baker said. “We don’t always want to apply potable water for irrigation.”

Denver’s non-potable system has a current capacity of 30 million gallons a day, expandable to 45 million gallons a day. The distribution system includes more than 50 miles of pipe with two major pump stations and storage tanks, according to Denver Water’s website. The system began operating in 2004, and when the recycled water system build-out is complete, Denver Water’s recycled supply will account for about 5 percent of the city’s total water volume annually, according to Travis Thompson, media coordinator for Denver Water.