From email from Reclamation (Kara Lamb):

We are getting ready to start importing water from the West Slope collection of the Fryingpan-Arkansas system to the East Slope. As long as minimum flows at both the Thomasville and Hunter Creek gages are met, we can begin diversions of additional water through the Boustead Tunnel.

Here are the minimum flows for the Fryingpan River at Thomasville:

Date Min Flow, (cfs)
Oct. 1 – Mar. 31 30
Apr. 1 – Apr. 30 100
May 1 – May 31 150
Jun. 1 – Jun. 30 200
Jul. 1 – Jul. 31 100
Aug. 1 – Aug 31 75
Sep 1 – Sep 30 65

Additionally, at Twin Lakes dam, we are curtailing releases to Lake Creek and the Arkansas River today and tomorrow. Today, we scaled back to about 100 cfs. Tomorrow, we will continue scaling back to 0 cfs while a regular review of the dam is conducted. Once the review is complete, we will bring releases back up.

More Fryingpan-Arkansas Project coverage here.