Arkansas Valley: Colorado Water Supply Reserve Account distribution recap

A picture named arkansasriverbasin.jpg

From The Pueblo Chieftain (Chris Woodka):

In 2006, SB179 had created the Water Supply Reserve Account, and the roundtables were being asked to bring forward projects that would use money to identify water needs, evaluate available water supplies or build projects. There weren’t hard-and-fast guidelines and proposals had to pass muster of the Colorado Water Conservation Board. Three proposals moved ahead that day: the Arkansas Valley Conduit, tamarisk removal and a study of recharge in the Upper Black Squirrel Aquifer in El Paso County. Since then, more than $4 million has been brought into the Arkansas River basin for 21 water projects or activities through the roundtable. The Rio Grande basin also has received about $4 million Like a snowball, those funds have leveraged more money as they were spent. Statewide, $26 million in grants from the account have been matched by $50 million from other sources…

BASIN BENEFITS

Since 2007, the Arkansas River Basin has received more than $4 million from a state fund established in 2006 to fund water activities. Projects include:

2007

Arkansas Valley Conduit, $200,000
Tamarisk control, $50,000
Upper Black Squirrel recharge, $45,200
Groundwater conference, $24,721
Fountain Creek Vision Task Force, $75,000
Round Mountain Water District, $120,000
Lower Ark Rotational Fallowing, $150,000

2008

Upper Big Sandy water balance, $45,000
Transfers subcommittee, $23,860
Las Animas water, $300,000
Zebra mussels, Lake Pueblo, $1 million
Colorado State University basinwide investigation, $600,000
Zero liquid discharge (reverse-osmosis brine), $725,000
Upper Ark water monitoring devices, $285,000

2009

Headwaters diversion improvements, $58,000
Non-consumptive needs quantification, $148,975
Fountain Creek sediment removal demonstration, $225,000
Groundwater policy, aquifer storage and recovery, $225,000

2010

Upper Arkansas water balance, $190,000
Fountain Creek flathead chub study, $35,000
Flaming Gorge Task Force study, $40,000

More IBCC — basin roundtables coverage here.

Leave a Reply